Thursday, 8 October 2026
88% of the 22,082 passenger trains whose arrival was recorded on Thursday, 8 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 25,813 recorded runs, 427 did not run at all. Among those whose arrival reached the archive, 19,474 were within five minutes, 2,494 between five and thirty minutes down, and 114 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 677 services.
London Overground came closest to running to time, 97.0% of its 1,558 recorded arrivals; Chiltern Railways had the largest cancelled share at 9.8%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
The day in numbers
| Passenger trains recorded | 25,813 | |
|---|---|---|
| Cancelled | 427 | 1.7% |
| Arrival time recorded | 22,082 | 87.0% of those that ran |
| …arrived within 5 minutes | 19,474 | 88.2% |
| …arrived 5 to 30 minutes late | 2,494 | 11.3% |
| …arrived more than 30 minutes late | 114 | 0.5% |
| Average delay at destination | 1.6 min |
Every percentage among the bands is of the 22,082 trains whose arrival reached the archive — not of all 25,813, and the bands are exclusive. 3,304 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,024 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,024 | 0% | 2,238 | 94% | 93% | 1 min |
Northern NT | 2,821 | 1% | 2,701 | 90% | 89% | 1.1 min |
Great Western Railway GW | 2,173 | 0% | 1,705 | 88% | 88% | 1.4 min |
Southeastern SE | 1,819 | 2% | 1,758 | 88% | 87% | 1.9 min |
South Western Railway SW | 1,740 | 2% | 1,549 | 89% | 87% | 1.4 min |
Southern SN | 1,725 | 3% | 1,619 | 88% | 85% | 2 min |
London Overground LO | 1,601 | 2% | 1,558 | 97% | 95% | -0.2 min |
West Midlands Railway LM | 1,333 | 2% | 1,255 | 85% | 83% | 2.3 min |
Greater Anglia LE | 1,304 | 0% | 1,294 | 95% | 94% | 0.3 min |
Transport for Wales AW | 1,238 | 1% | 1,041 | 94% | 93% | -0.4 min |
Thameslink TL | 968 | 2% | 620 | 85% | 83% | 1.8 min |
London Underground LT | 771 | 0% | 367 | 94% | 94% | 1.3 min |
Elizabeth line XR | 693 | 9% | 627 | 82% | 75% | 2 min |
East Midlands Railway EM | 620 | 1% | 485 | 78% | 77% | 3 min |
Merseyrail ME | 616 | 4% | 569 | 95% | 91% | 1 min |
Great Northern GN | 436 | 2% | 387 | 81% | 79% | 2.9 min |
c2c CC | 422 | 7% | 285 | 59% | 54% | 7.4 min |
Avanti West Coast VT | 417 | 1% | 287 | 40% | 39% | 10.3 min |
Chiltern Railways CH | 348 | 10% | 312 | 91% | 82% | 1.4 min |
CrossCountry XC | 347 | 1% | 273 | 64% | 64% | 6 min |
TransPennine Express TP | 327 | 1% | 309 | 77% | 77% | 3.1 min |
London North Eastern Railway GR | 315 | 0% | 198 | 80% | 80% | 1.1 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 95% | 95% | 0.8 min |
Heathrow Express HX | 151 | 0% | 151 | 88% | 88% | 1.5 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 100% | 100% | 0.4 min |
Gatwick Express GX | 72 | 0% | 72 | 81% | 81% | 3 min |
Eurostar ES | 55 | 0% | 55 | 67% | 67% | 8.5 min |
Charter/Other ZZ | 54 | 0% | 5 | 60% | 60% | 8.8 min |
Island Line IL | 52 | 0% | 47 | 91% | 91% | 5.9 min |
Grand Central GC | 20 | 0% | 20 | 45% | 45% | 9.4 min |
West Coast Railway Co WR | 18 | 0% | 5 | 100% | 100% | -12.4 min |
Hull Trains HT | 14 | 0% | 14 | 71% | 71% | 6.3 min |
Lumo LD | 11 | 0% | 11 | 100% | 100% | -0.5 min |
Lumo Stirling LF | 10 | 0% | 10 | 70% | 70% | 4.8 min |
North Yorkshire Moors Railway NY | 8 | 0% | 1 | 0% | 0% | 64 min |
LS LS | 8 | 0% | 0 | — | — | — |
Caledonian Sleeper CS | 6 | 0% | 6 | 83% | 83% | -4 min |
TY TY | 4 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 87% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
677 services
This service has been delayed by a speed restriction
666 services
This service has been delayed by a fault with the signalling system
536 services
This service has been delayed by congestion
422 services
This service has been delayed by a speed restriction over defective track
253 services
This service has been delayed by a fault on a train earlier
186 services
This service has been delayed by a problem currently under investigation
174 services
This service has been delayed by a late running freight train
92 services
Why trains were cancelled
A reason reached the archive for 236 of the 427 cancellations (55.3%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
72 services
This service has been cancelled because of a late running train being in front of this one
40 services
This service has been cancelled because of a fault on a train earlier
32 services
This service has been cancelled because of engineering works not being finished on time
22 services
This service has been cancelled because of a fault on this train
19 services
This service has been cancelled because of a speed restriction
18 services
This service has been cancelled because of failure of the electricity supply
17 services
This service has been cancelled because of congestion
16 services
The longest delays
The worst of them arrived 2h 51m behind schedule — London Victoria to Littlehampton, booked away at 13:16, run by Southern. The ten longest range from 2h 51m down to 1h 23m, and they belong to 6 operators, Southern accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
13:16 | London Victoria to Littlehampton 1H30 · SN | 2h 51m |
14:28 | Brighton to Portsmouth & Southsea 1S38 · SN | 2h 46m |
13:57 | Portsmouth & Southsea to Brighton 1S39 · SN | 2h 35m |
09:02 | Shoeburyness to London Fenchurch Street 1B43 · CC | 1h 47m |
20:19 | Liverpool Lime Street to Cleethorpes 1B94 · TP | 1h 33m |
05:54 | Shrewsbury to Swansea 2V24 · AW | 1h 30m |
11:31 | Shrewsbury to Swansea 2V28 · AW | 1h 26m |
04:46 | Carmarthen to Shrewsbury 2M00 · AW | 1h 25m |
06:46 | London Euston to Manchester Piccadilly 1H03 · VT | 1h 23m |
11:26 | Ryde Pier Head to Shanklin 2D19 · IL | 1h 23m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 60% of 151 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 12.
What ran
Formations were recorded for 27,330 trains on this date, made up of 2,926 individual units and 12,855 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,322 of the day's recorded trains from a pool of 220 units.
The average train was 5.6 vehicles long. The longest formation recorded was 22 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,322 | 220 |
| Class 465 | 1,646 | 102 |
| Class 450 | 1,506 | 117 |
| Class 720 | 1,506 | 131 |
| Class 387 | 1,447 | 96 |
| Class 158 | 1,437 | 135 |
| Class 150 | 1,383 | 87 |
| Class 345 | 1,262 | 68 |
| Class 165 | 1,178 | 64 |
| Class 156 | 1,132 | 91 |
| Class 375 | 1,044 | 103 |
| Class 700 | 1,031 | 107 |
Of 25,813 runs, 27,330 had a formation published (106%) — these are allocations rather than observations.
Buses
17,470 buses from 186 operators were seen on this date, across 3,215,133 position reports.
140,381 bus journeys were followed to their destination on this date. 101,410 arrived on time, 8,156 late, and 30,815 — 22% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0.1 minutes late, and 888 journeys finished more than twenty minutes down.
| Journeys followed to destination | 140,381 | |
|---|---|---|
| On time | 101,410 | 72.2% |
| Early | 30,815 | 22.0% |
| Late | 8,156 | 5.8% |
| …more than 20 minutes late | 888 | 0.6% |
| Average arrival | 0.1 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 108,005 | 75% | 22% |
Nottingham City Transport NCTR | 2,397 | 76% | 17% |
First South Yorkshire FSYO | 2,088 | 60% | 26% |
Go North East GNEL | 2,078 | 73% | 9% |
First Leeds FLDS | 1,698 | 58% | 27% |
Bee Network BNSM | 945 | 80% | 14% |
Arriva Yorkshire WRAY | 879 | 56% | 27% |
First Potteries FPOT | 860 | 59% | 30% |
National Express West Midlands TNXB | 836 | 78% | 15% |
National Express NATX | 762 | 37% | 33% |
First Leicester FLEI | 738 | 58% | 37% |
Preston Bus PBLT | 736 | 64% | 29% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (89%), and National Express furthest from it (37%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 8 Oct 2026 itself. How these figures are measured · Sources and licences