Thursday, 22 October 2026
86% of the 19,193 passenger trains whose arrival was recorded on Thursday, 22 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,323 recorded runs, 528 did not run at all. Among those whose arrival reached the archive, 16,474 were within five minutes, 2,574 between five and thirty minutes down, and 145 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 806 services.
Merseyrail came closest to running to time, 98.8% of its 566 recorded arrivals; Chiltern Railways had the largest cancelled share at 6.1%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 133,019 journeys followed to their destination, 70.8% on time.
The day in numbers
| Passenger trains recorded | 26,323 | |
|---|---|---|
| Cancelled | 528 | 2.0% |
| Arrival time recorded | 19,193 | 74.4% of those that ran |
| …arrived within 5 minutes | 16,474 | 85.8% |
| …arrived 5 to 30 minutes late | 2,574 | 13.4% |
| …arrived more than 30 minutes late | 145 | 0.8% |
| Average delay at destination | 2 min |
Every percentage among the bands is of the 19,193 trains whose arrival reached the archive — not of all 26,323, and the bands are exclusive. 6,602 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,105 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,105 | 1% | 2,062 | 90% | 89% | 1.3 min |
Northern NT | 2,844 | 3% | 2,360 | 83% | 80% | 2.2 min |
Great Western Railway GW | 2,175 | 1% | 1,452 | 79% | 78% | 3.1 min |
Southeastern SE | 1,791 | 1% | 1,583 | 89% | 88% | 1.5 min |
South Western Railway SW | 1,779 | 5% | 1,214 | 79% | 73% | 4.3 min |
Southern SN | 1,721 | 3% | 1,448 | 86% | 83% | 1.9 min |
London Overground LO | 1,602 | 1% | 1,431 | 97% | 95% | -0.2 min |
Greater Anglia LE | 1,393 | 0% | 1,142 | 94% | 94% | 0.4 min |
West Midlands Railway LM | 1,341 | 2% | 989 | 85% | 83% | 2 min |
Transport for Wales AW | 1,251 | 3% | 902 | 89% | 86% | 0.4 min |
Thameslink TL | 982 | 3% | 554 | 90% | 85% | 1.2 min |
Merseyrail ME | 815 | 0% | 566 | 99% | 99% | -0.2 min |
London Underground LT | 787 | 0% | 174 | 82% | 82% | 2.9 min |
Elizabeth line XR | 693 | 4% | 536 | 91% | 86% | 0.2 min |
East Midlands Railway EM | 631 | 0% | 456 | 82% | 81% | 2.2 min |
Great Northern GN | 454 | 4% | 335 | 82% | 78% | 2.9 min |
Avanti West Coast VT | 420 | 1% | 292 | 43% | 43% | 11.4 min |
c2c CC | 412 | 4% | 297 | 93% | 88% | 1.7 min |
CrossCountry XC | 348 | 4% | 242 | 65% | 61% | 6 min |
Chiltern Railways CH | 347 | 6% | 302 | 93% | 87% | 1.3 min |
TransPennine Express TP | 339 | 2% | 272 | 64% | 63% | 5.3 min |
London North Eastern Railway GR | 327 | 0% | 184 | 71% | 71% | 4 min |
Tyne and Wear Metro TW | 174 | 0% | 71 | 93% | 93% | 1 min |
Heathrow Express HX | 152 | 0% | 133 | 89% | 89% | 1.5 min |
Sheffield Supertram SJ | 98 | 0% | 37 | 84% | 84% | 2.5 min |
Gatwick Express GX | 73 | 3% | 57 | 70% | 68% | 4.5 min |
Charter/Other ZZ | 57 | 0% | 1 | 100% | 100% | -27 min |
Eurostar ES | 56 | 0% | 28 | 18% | 18% | 26.3 min |
Island Line IL | 52 | 0% | 8 | 100% | 100% | 0 min |
Grand Central GC | 20 | 0% | 19 | 68% | 68% | 7.6 min |
West Coast Railway Co WR | 18 | 0% | 4 | 100% | 100% | -8.2 min |
Hull Trains HT | 14 | 0% | 13 | 77% | 77% | 3.3 min |
Lumo LD | 12 | 8% | 9 | 44% | 40% | 8.2 min |
Lumo Stirling LF | 10 | 0% | 10 | 50% | 50% | 10.9 min |
Caledonian Sleeper CS | 10 | 0% | 10 | 100% | 100% | -7.7 min |
North Yorkshire Moors Railway NY | 8 | 0% | 0 | — | — | — |
LS LS | 8 | 0% | 0 | — | — | — |
TY TY | 4 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 84% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
806 services
This service has been delayed by a speed restriction
426 services
This service has been delayed by a speed restriction over defective track
418 services
This service has been delayed by a fault with the signalling system
338 services
This service has been delayed by a broken down train
250 services
This service has been delayed by congestion
158 services
This service has been delayed by a problem currently under investigation
156 services
This service has been delayed by police dealing with an incident near the railway
115 services
Why trains were cancelled
A reason reached the archive for 265 of the 528 cancellations (50.2%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted slippery rails
58 services
This service has been cancelled because of a fault with the signalling system
39 services
This service has been cancelled because of police dealing with an incident near the railway
37 services
This service has been cancelled because of a late running train being in front of this one
34 services
This service has been cancelled because of a person being hit by a train
33 services
This service has been cancelled because of the emergency services dealing with an incident
29 services
This service has been cancelled because of a fault on a train
19 services
This service has been cancelled because of a speed restriction
16 services
The longest delays
The worst of them arrived 2h 46m behind schedule — Alton to London Waterloo, booked away at 20:43, run by South Western Railway. The ten longest range from 2h 46m down to 1h 26m, and they belong to 5 operators, South Western Railway accounting for 6. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
20:43 | Alton to London Waterloo 1A72 · SW | 2h 46m |
15:09 | Haslemere to London Waterloo 2P50 · SW | 2h 42m |
15:30 | London Waterloo to Portsmouth Harbour 1P47 · SW | 2h 38m |
16:00 | London Waterloo to Portsmouth Harbour 1P49 · SW | 2h 30m |
10:04 | Orpington to London Victoria 2D46 · SE | 1h 38m |
17:23 | London Waterloo to Exeter St Davids 1L53 · SW | 1h 38m |
16:31 | Portsmouth Harbour to London Waterloo 1P58 · SW | 1h 38m |
17:47 | Bedford to Bletchley 2S24 · LM | 1h 30m |
11:10 | London Kings Cross to Leeds 1D12 · GR | 1h 27m |
08:36 | Paris Nord to London St Pancras (Intl) 9O13 · ES | 1h 26m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 13% of 156 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 18.
What ran
Formations were recorded for 27,206 trains on this date, made up of 2,912 individual units and 12,786 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,321 of the day's recorded trains from a pool of 223 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,321 | 223 |
| Class 465 | 1,649 | 101 |
| Class 720 | 1,524 | 124 |
| Class 450 | 1,453 | 117 |
| Class 158 | 1,375 | 133 |
| Class 150 | 1,346 | 92 |
| Class 387 | 1,344 | 93 |
| Class 345 | 1,231 | 67 |
| Class 165 | 1,154 | 61 |
| Class 156 | 1,147 | 91 |
| Class 700 | 1,036 | 105 |
| Class 375 | 1,016 | 100 |
Of 26,323 runs, 27,206 had a formation published (103%) — these are allocations rather than observations.
Buses
17,490 buses from 180 operators were seen on this date, across 3,207,631 position reports.
133,019 bus journeys were followed to their destination on this date. 94,113 arrived on time, 6,994 late, and 31,912 — 24% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 133,019 | |
|---|---|---|
| On time | 94,113 | 70.8% |
| Early | 31,912 | 24.0% |
| Late | 6,994 | 5.3% |
| …more than 15 minutes late | 695 | 0.5% |
| Average arrival | 0.2 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 100,716 | 73% | 24% |
Nottingham City Transport NCTR | 2,520 | 77% | 19% |
Go North East GNEL | 2,083 | 72% | 9% |
First South Yorkshire FSYO | 2,017 | 62% | 24% |
First Leeds FLDS | 1,698 | 60% | 29% |
Bee Network BNSM | 957 | 80% | 15% |
Arriva Yorkshire WRAY | 891 | 58% | 28% |
First Potteries FPOT | 864 | 57% | 33% |
National Express West Midlands TNXB | 843 | 75% | 17% |
National Express NATX | 758 | 33% | 35% |
Bee Network BNML | 750 | 71% | 22% |
Preston Bus PBLT | 732 | 62% | 30% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (33%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 22 Oct 2026 itself. How these figures are measured · Sources and licences