Saturday, 14 November 2026
83% of the 20,145 passenger trains whose arrival was recorded on Saturday, 14 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 25,033 recorded runs, 621 did not run at all. Among those whose arrival reached the archive, 16,787 were within five minutes, 3,178 between five and thirty minutes down, and 180 more than half an hour — the tail that people actually remember.
“This service has been delayed by a speed restriction” was the most common explanation, given for 833 services.
Elizabeth line came closest to running to time, 98.6% of its 661 recorded arrivals; Northern had the largest cancelled share at 7.2%.
A weekend timetable, so the 25,033 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
Buses on this date: 124,382 journeys followed to their destination, 69.8% on time.
The day in numbers
| Passenger trains recorded | 25,033 | |
|---|---|---|
| Cancelled | 621 | 2.5% |
| Arrival time recorded | 20,145 | 82.5% of those that ran |
| …arrived within 5 minutes | 16,787 | 83.3% |
| …arrived 5 to 30 minutes late | 3,178 | 15.8% |
| …arrived more than 30 minutes late | 180 | 0.9% |
| Average delay at destination | 2.4 min |
Every percentage among the bands is of the 20,145 trains whose arrival reached the archive — not of all 25,033, and the bands are exclusive. 4,267 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,960 runs down to LS on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,960 | 1% | 2,171 | 90% | 89% | 1.8 min |
Northern NT | 2,841 | 7% | 2,417 | 77% | 71% | 3.3 min |
Great Western Railway GW | 2,131 | 4% | 1,502 | 79% | 74% | 2.8 min |
Southern SN | 1,715 | 1% | 1,434 | 84% | 83% | 2.2 min |
London Overground LO | 1,677 | 3% | 1,559 | 93% | 90% | 0.9 min |
South Western Railway SW | 1,624 | 1% | 1,458 | 85% | 84% | 1.9 min |
Greater Anglia LE | 1,311 | 0% | 1,162 | 96% | 95% | 0.1 min |
Transport for Wales AW | 1,268 | 3% | 1,028 | 78% | 75% | 2.5 min |
West Midlands Railway LM | 1,267 | 2% | 1,146 | 81% | 79% | 2.9 min |
Southeastern SE | 1,195 | 3% | 1,098 | 77% | 75% | 3.3 min |
Thameslink TL | 909 | 1% | 587 | 83% | 82% | 1.9 min |
East Midlands Railway EM | 817 | 1% | 534 | 66% | 65% | 5.2 min |
London Underground LT | 713 | 0% | 350 | 92% | 92% | 1.8 min |
Elizabeth line XR | 665 | 1% | 661 | 99% | 98% | -1.2 min |
Merseyrail ME | 622 | 2% | 605 | 98% | 96% | 0 min |
TransPennine Express TP | 595 | 2% | 351 | 74% | 72% | 3.4 min |
Avanti West Coast VT | 353 | 3% | 272 | 28% | 26% | 13.2 min |
Great Northern GN | 347 | 1% | 310 | 85% | 84% | 1.8 min |
CrossCountry XC | 336 | 7% | 242 | 56% | 51% | 8.4 min |
c2c CC | 336 | 2% | 278 | 87% | 85% | 1.7 min |
London North Eastern Railway GR | 303 | 1% | 188 | 63% | 62% | 6 min |
Chiltern Railways CH | 230 | 7% | 205 | 89% | 83% | 1.7 min |
Tyne and Wear Metro TW | 166 | 0% | 164 | 95% | 95% | 1.2 min |
Heathrow Express HX | 152 | 0% | 152 | 94% | 94% | 0.3 min |
Island Line IL | 138 | 0% | 0 | — | — | — |
Sheffield Supertram SJ | 99 | 0% | 72 | 90% | 90% | 2 min |
Gatwick Express GX | 72 | 1% | 71 | 65% | 64% | 5.2 min |
Eurostar ES | 47 | 0% | 47 | 87% | 87% | 3.8 min |
Charter/Other ZZ | 40 | 0% | 4 | 50% | 50% | 5.5 min |
West Coast Railway Co WR | 27 | 0% | 14 | 36% | 36% | 34.7 min |
Grand Central GC | 20 | 0% | 19 | 42% | 42% | 9.6 min |
TY TY | 18 | 0% | 8 | 50% | 50% | 13.2 min |
Lumo LD | 12 | 0% | 12 | 50% | 50% | 9.2 min |
Hull Trains HT | 12 | 0% | 12 | 67% | 67% | 5.8 min |
Lumo Stirling LF | 10 | 0% | 10 | 80% | 80% | 3.7 min |
Caledonian Sleeper CS | 3 | 0% | 2 | 100% | 100% | -12 min |
LS LS | 2 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 83% and 81% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a speed restriction
833 services
This service has been delayed by a late running train being in front of this one
697 services
This service has been delayed by a points failure
372 services
This service has been delayed by congestion
337 services
This service has been delayed by a speed restriction over defective track
302 services
This service has been delayed by a fault with the signalling system
229 services
This service has been delayed by a problem currently under investigation
162 services
This service has been delayed by urgent repairs to the track
135 services
Why trains were cancelled
A reason reached the archive for 399 of the 621 cancellations (64.3%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
96 services
This service has been cancelled because of urgent repairs to the track
82 services
This service has been cancelled because of forecasted slippery rails
65 services
This service has been cancelled because of a points failure
65 services
This service has been cancelled because of a fault on a train
34 services
This service has been cancelled because of train crew being delayed by service disruption
20 services
This service has been cancelled because of a fault on this train
20 services
This service has been cancelled because of congestion
17 services
The longest delays
The worst of them arrived 2h 06m behind schedule — LESTLIP to Leicester, booked away at 09:20, run by West Coast Railway Co. The ten longest range from 2h 06m down to 1h 16m, and they belong to 5 operators, Northern accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
09:20 | LESTLIP to Leicester 5Z33 · WR | 2h 06m |
16:48 | Manchester Airport to Blackpool North 1N53 · NT | 2h 05m |
23:30 | Glasgow Central to Ayr 1K71 · SR | 2h 03m |
17:17 | Manchester Airport to Blackpool North 1N54 · NT | 1h 58m |
13:58 | York to YORKHLS 5Z35 · WR | 1h 27m |
07:29 | Manchester Airport to Barrow-in-Furness 1C53 · NT | 1h 25m |
13:52 | York to YORKHLS 5Z34 · WR | 1h 23m |
21:51 | Carlisle to Whitehaven 2C56 · NT | 1h 21m |
08:40 | London Euston to Edinburgh 9S54 · VT | 1h 18m |
15:51 | Liverpool Lime Street to Norwich 1L15 · EM | 1h 16m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 58% of 137 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 21.
What ran
Formations were recorded for 24,182 trains on this date, made up of 2,620 individual units and 11,518 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 2,534 of the day's recorded trains from a pool of 182 units.
The average train was 5.5 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 2,534 | 182 |
| Class 158 | 1,481 | 135 |
| Class 450 | 1,377 | 106 |
| Class 387 | 1,302 | 84 |
| Class 150 | 1,274 | 86 |
| Class 720 | 1,200 | 91 |
| Class 345 | 1,168 | 62 |
| Class 156 | 1,104 | 89 |
| Class 385 | 1,062 | 65 |
| Class 170 | 952 | 99 |
| Class 465 | 946 | 70 |
| Class 700 | 918 | 90 |
Of 25,033 runs, 24,182 had a formation published (97%) — these are allocations rather than observations.
Buses
15,711 buses from 155 operators were seen on this date, across 2,671,593 position reports.
124,382 bus journeys were followed to their destination on this date. 86,833 arrived on time, 7,452 late, and 30,097 — 24% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 756 journeys finished more than fifteen minutes down.
| Journeys followed to destination | 124,382 | |
|---|---|---|
| On time | 86,833 | 69.8% |
| Early | 30,097 | 24.2% |
| Late | 7,452 | 6.0% |
| …more than 15 minutes late | 756 | 0.6% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 94,984 | 72% | 24% |
Nottingham City Transport NCTR | 1,953 | 78% | 15% |
Go North East GNEL | 1,948 | 74% | 9% |
First South Yorkshire FSYO | 1,795 | 51% | 27% |
First Leeds FLDS | 1,519 | 58% | 29% |
First Bristol, Bath & the West FBRI | 1,383 | 57% | 24% |
National Express NATX | 900 | 32% | 37% |
Bee Network BNSM | 840 | 80% | 18% |
Arriva Yorkshire WRAY | 774 | 56% | 26% |
Bee Network BNML | 727 | 74% | 18% |
First Potteries FPOT | 702 | 55% | 36% |
First Leicester FLEI | 631 | 52% | 42% |
Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (91%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 14 Nov 2026 itself. How these figures are measured · Sources and licences