Friday, 20 November 2026
86% of the 21,850 passenger trains whose arrival was recorded on Friday, 20 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,225 recorded runs, 583 did not run at all. Among those whose arrival reached the archive, 18,875 were within five minutes, 2,806 between five and thirty minutes down, and 169 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 1,307 services.
Merseyrail came closest to running to time, 98.1% of its 618 recorded arrivals; CrossCountry had the largest cancelled share at 14.1%.
Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.
Buses on this date: 140,715 journeys followed to their destination, 70.9% on time.
The day in numbers
| Passenger trains recorded | 26,225 | |
|---|---|---|
| Cancelled | 583 | 2.2% |
| Arrival time recorded | 21,850 | 85.2% of those that ran |
| …arrived within 5 minutes | 18,875 | 86.4% |
| …arrived 5 to 30 minutes late | 2,806 | 12.8% |
| …arrived more than 30 minutes late | 169 | 0.8% |
| Average delay at destination | 1.8 min |
Every percentage among the bands is of the 21,850 trains whose arrival reached the archive — not of all 26,225, and the bands are exclusive. 3,792 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,051 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,051 | 2% | 2,160 | 85% | 83% | 2.6 min |
Northern NT | 2,845 | 4% | 2,612 | 83% | 80% | 2.2 min |
Great Western Railway GW | 2,192 | 1% | 1,668 | 86% | 85% | 1.7 min |
Southeastern SE | 1,824 | 1% | 1,792 | 88% | 88% | 1.4 min |
South Western Railway SW | 1,782 | 4% | 1,515 | 83% | 79% | 1.8 min |
Southern SN | 1,703 | 1% | 1,631 | 89% | 88% | 1.3 min |
London Overground LO | 1,613 | 2% | 1,567 | 95% | 93% | 0.3 min |
West Midlands Railway LM | 1,333 | 1% | 1,293 | 86% | 85% | 1.9 min |
Greater Anglia LE | 1,316 | 0% | 1,299 | 96% | 95% | 0 min |
Transport for Wales AW | 1,256 | 2% | 1,011 | 88% | 86% | 1.4 min |
Thameslink TL | 994 | 7% | 572 | 92% | 82% | 0.9 min |
London Underground LT | 785 | 0% | 201 | 86% | 86% | 3.2 min |
East Midlands Railway EM | 749 | 1% | 501 | 80% | 79% | 2.6 min |
Elizabeth line XR | 696 | 3% | 676 | 96% | 93% | -0.6 min |
Merseyrail ME | 622 | 0% | 618 | 98% | 98% | -0.1 min |
Great Northern GN | 432 | 2% | 383 | 80% | 79% | 3.1 min |
c2c CC | 418 | 4% | 346 | 93% | 88% | 1.1 min |
Avanti West Coast VT | 417 | 2% | 307 | 43% | 42% | 10.9 min |
CrossCountry XC | 355 | 14% | 226 | 52% | 42% | 10.2 min |
Chiltern Railways CH | 338 | 1% | 334 | 97% | 96% | -0.1 min |
TransPennine Express TP | 334 | 2% | 312 | 65% | 64% | 5.3 min |
London North Eastern Railway GR | 320 | 1% | 197 | 54% | 54% | 8.5 min |
Tyne and Wear Metro TW | 174 | 0% | 153 | 90% | 90% | 1.4 min |
Heathrow Express HX | 152 | 0% | 149 | 91% | 91% | 1.1 min |
Island Line IL | 135 | 0% | 58 | 98% | 98% | 0.6 min |
Sheffield Supertram SJ | 98 | 0% | 71 | 99% | 99% | 0.3 min |
Gatwick Express GX | 72 | 1% | 65 | 88% | 86% | 2 min |
Charter/Other ZZ | 67 | 6% | 4 | 100% | 50% | 1 min |
Eurostar ES | 57 | 0% | 56 | 66% | 66% | 7.6 min |
Grand Central GC | 20 | 0% | 19 | 32% | 32% | 8.1 min |
Hull Trains HT | 14 | 0% | 14 | 71% | 71% | 3.3 min |
LS LS | 13 | 0% | 4 | 25% | 25% | 35 min |
Lumo LD | 12 | 8% | 11 | 18% | 17% | 21.2 min |
Lumo Stirling LF | 10 | 10% | 9 | 56% | 50% | 8.7 min |
Caledonian Sleeper CS | 10 | 10% | 8 | 50% | 44% | 24.5 min |
SO SO | 7 | 0% | 7 | 57% | 57% | 5.9 min |
West Coast Railway Co WR | 5 | 0% | 1 | 0% | 0% | 15 min |
TY TY | 4 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 84% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
1,307 services
This service has been delayed by a fault with the signalling system
400 services
This service has been delayed by congestion
393 services
This service has been delayed by a speed restriction over defective track
372 services
This service has been delayed by a speed restriction
301 services
This service has been delayed by a problem currently under investigation
272 services
This service has been delayed by police dealing with an incident near the railway yesterday
106 services
This service has been delayed by a fault on a train earlier
105 services
Why trains were cancelled
A reason reached the archive for 370 of the 583 cancellations (63.5%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
147 services
This service has been cancelled because of a power cut at the station
63 services
This service has been cancelled because of a shortage of train drivers
45 services
This service has been cancelled because of police dealing with an incident near the railway yesterday
29 services
This service has been cancelled because of slippery rails
27 services
This service has been cancelled because of a late running train being in front of this one
21 services
This service has been cancelled because of congestion
19 services
This service has been cancelled because of a fault on a train
19 services
The longest delays
The worst of them arrived 2h 54m behind schedule — Milford Haven to Manchester Piccadilly, booked away at 15:06, run by Transport for Wales. The ten longest range from 2h 54m down to 1h 24m, and they belong to 9 operators, Great Western Railway accounting for 2. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
15:06 | Milford Haven to Manchester Piccadilly 1W24 · AW | 2h 54m |
04:28 | Edinburgh to Aberdeen 1A25 · CS | 2h 33m |
11:27 | Plymouth to Glasgow Central 1S49 · XC | 2h 22m |
06:05 | Penzance to London Paddington 1A76 · GW | 2h 14m |
05:40 | Penzance to Exeter St Davids 2E02 · GW | 2h 03m |
10:00 | CREWDHS to DONCWY 5Z11 · LS | 1h 45m |
07:55 | Inverness to London Kings Cross 1E13 · GR | 1h 38m |
23:07 | London St Pancras (Intl) to Ramsgate 1L74 · SE | 1h 34m |
21:14 | Manchester Piccadilly to London Euston 1A83 · VT | 1h 29m |
08:59 | York to Sheffield 2Y87 · NT | 1h 24m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 51% of 164 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 17.
What ran
Formations were recorded for 27,288 trains on this date, made up of 2,913 individual units and 12,821 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,253 of the day's recorded trains from a pool of 220 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,253 | 220 |
| Class 465 | 1,597 | 98 |
| Class 158 | 1,512 | 133 |
| Class 450 | 1,462 | 117 |
| Class 720 | 1,440 | 124 |
| Class 150 | 1,337 | 91 |
| Class 387 | 1,318 | 93 |
| Class 345 | 1,256 | 67 |
| Class 165 | 1,131 | 61 |
| Class 700 | 1,038 | 107 |
| Class 385 | 1,006 | 66 |
| Class 156 | 996 | 88 |
Of 26,225 runs, 27,288 had a formation published (104%) — these are allocations rather than observations.
Buses
17,456 buses from 189 operators were seen on this date, across 3,226,168 position reports.
140,715 bus journeys were followed to their destination on this date. 99,811 arrived on time, 8,456 late, and 32,448 — 23% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 140,715 | |
|---|---|---|
| On time | 99,811 | 70.9% |
| Early | 32,448 | 23.1% |
| Late | 8,456 | 6.0% |
| …more than 15 minutes late | 936 | 0.7% |
| Average arrival | 0.1 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 107,233 | 74% | 23% |
Nottingham City Transport NCTR | 2,437 | 77% | 16% |
First South Yorkshire FSYO | 2,247 | 56% | 24% |
Go North East GNEL | 2,075 | 71% | 10% |
First Leeds FLDS | 1,691 | 60% | 24% |
First Bristol, Bath & the West FBRI | 1,622 | 59% | 27% |
Arriva Yorkshire WRAY | 929 | 60% | 27% |
Bee Network BNSM | 919 | 76% | 19% |
National Express NATX | 868 | 30% | 37% |
First Potteries FPOT | 828 | 55% | 34% |
Bee Network BNML | 787 | 73% | 19% |
First Leicester FLEI | 752 | 60% | 37% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (90%), and National Express furthest from it (30%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 20 Nov 2026 itself. How these figures are measured · Sources and licences