Sunday, 22 November 2026
The railway ran close to plan on Sunday, 22 November 2026: 91% of the 12,876 passenger trains whose arrival was recorded were within five minutes, and only 188 of 17,245 were cancelled.
11,773 of the 12,876 trains whose arrival was recorded were within five minutes, and the average delay was 0.8 minutes. Days like this rarely make the news, which is part of why they are worth recording.
A weekend timetable, so the 17,245 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
Even so, 50 trains were more than half an hour late. The worst was the 13:09 Portsmouth Harbour to Cardiff Central, which arrived 1h 56m behind schedule.
Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (239 services).
Buses on this date: 95,241 journeys followed to their destination, 58.9% on time.
The day in numbers
| Passenger trains recorded | 17,245 | |
|---|---|---|
| Cancelled | 188 | 1.1% |
| Arrival time recorded | 12,876 | 75.5% of those that ran |
| …arrived within 5 minutes | 11,773 | 91.4% |
| …arrived 5 to 30 minutes late | 1,053 | 8.2% |
| …arrived more than 30 minutes late | 50 | 0.4% |
| Average delay at destination | 0.8 min |
Every percentage among the bands is of the 12,876 trains whose arrival reached the archive — not of all 17,245, and the bands are exclusive. 4,181 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
36 operators ran passenger services on this date, from ScotRail on 1,790 runs down to LS on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 1,790 | 0% | 1,110 | 95% | 95% | 0.8 min |
South Western Railway SW | 1,702 | 1% | 991 | 91% | 89% | 1.5 min |
Northern NT | 1,568 | 0% | 1,320 | 92% | 92% | 0.6 min |
Southern SN | 1,359 | 1% | 871 | 92% | 91% | 1.1 min |
London Overground LO | 1,357 | 1% | 1,097 | 99% | 98% | -0.6 min |
Great Western Railway GW | 1,227 | 1% | 939 | 85% | 84% | 2.6 min |
Southeastern SE | 1,156 | 0% | 954 | 91% | 90% | 0.9 min |
Greater Anglia LE | 1,147 | 0% | 858 | 96% | 96% | -0.2 min |
Transport for Wales AW | 775 | 1% | 657 | 91% | 90% | -0.3 min |
West Midlands Railway LM | 651 | 2% | 606 | 88% | 86% | 1.6 min |
Thameslink TL | 632 | 1% | 437 | 96% | 94% | -0.1 min |
Elizabeth line XR | 500 | 5% | 460 | 91% | 86% | 0.2 min |
London Underground LT | 387 | 0% | 94 | 99% | 99% | 0.8 min |
East Midlands Railway EM | 387 | 2% | 274 | 76% | 74% | 3.4 min |
Merseyrail ME | 324 | 0% | 324 | 99% | 99% | -0.5 min |
Avanti West Coast VT | 294 | 0% | 219 | 71% | 70% | 2.8 min |
Great Northern GN | 259 | 7% | 218 | 98% | 91% | -0.1 min |
TransPennine Express TP | 250 | 1% | 248 | 87% | 86% | 0.8 min |
CrossCountry XC | 247 | 8% | 145 | 72% | 63% | 5.1 min |
London North Eastern Railway GR | 212 | 0% | 157 | 82% | 81% | 0.9 min |
c2c CC | 212 | 5% | 195 | 99% | 94% | 0 min |
Chiltern Railways CH | 193 | 2% | 189 | 96% | 94% | 0.1 min |
Heathrow Express HX | 151 | 0% | 149 | 83% | 83% | 1.9 min |
Tyne and Wear Metro TW | 128 | 0% | 126 | 95% | 95% | 0.8 min |
Island Line IL | 127 | 0% | 60 | 100% | 100% | -0.2 min |
Eurostar ES | 54 | 0% | 53 | 79% | 79% | 5.7 min |
Sheffield Supertram SJ | 51 | 0% | 50 | 92% | 92% | 1 min |
TY TY | 18 | 0% | 12 | 83% | 83% | 2.6 min |
Grand Central GC | 18 | 6% | 17 | 71% | 67% | 4.1 min |
Charter/Other ZZ | 16 | 0% | 5 | 60% | 60% | 5.6 min |
West Coast Railway Co WR | 13 | 0% | 3 | 100% | 100% | -16.3 min |
Hull Trains HT | 12 | 0% | 12 | 50% | 50% | 5.9 min |
Lumo LD | 11 | 0% | 11 | 82% | 82% | 2 min |
Lumo Stirling LF | 8 | 0% | 8 | 63% | 63% | 9.2 min |
Caledonian Sleeper CS | 7 | 0% | 6 | 67% | 67% | -2.3 min |
LS LS | 2 | 0% | 1 | 100% | 100% | -7 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 91% and 90% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
239 services
This service has been delayed by a problem currently under investigation
172 services
This service has been delayed by trespassers on the railway earlier today
159 services
This service has been delayed by congestion
136 services
This service has been delayed by a speed restriction
113 services
This service has been delayed by the train departing late to maintain customer connections
102 services
This service has been delayed by a fault with the signalling system
85 services
This service has been delayed by a fault on a train
53 services
Why trains were cancelled
A reason reached the archive for 95 of the 188 cancellations (50.5%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault on a train
18 services
This service has been cancelled because of a shortage of train drivers
17 services
This service has been cancelled because of a fire next to the track
13 services
This service has been cancelled because of a fault on this train
13 services
This service has been cancelled because of trespassers on the railway earlier today
10 services
This service has been cancelled because of trespassers on the railway
10 services
This service has been cancelled because of a fault with the signalling system
9 services
This service has been cancelled because of the emergency services dealing with an incident
5 services
The longest delays
The worst of them arrived 1h 56m behind schedule — Portsmouth Harbour to Cardiff Central, booked away at 13:09, run by Great Western Railway. The ten longest range from 1h 56m down to 1h 05m, and they belong to 5 operators, Great Western Railway accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
13:09 | Portsmouth Harbour to Cardiff Central 1F20 · GW | 1h 56m |
11:30 | Penzance to Edinburgh 1S55 · XC | 1h 44m |
12:45 | Nottingham to Skegness 2S17 · EM | 1h 43m |
14:25 | Cardiff Central to Portsmouth Harbour 1F23 · GW | 1h 40m |
10:16 | Basingstoke to London Waterloo 2L32 · SW | 1h 22m |
09:17 | Portsmouth Harbour to London Waterloo 1T32 · SW | 1h 17m |
17:48 | Bristol Temple Meads to Weymouth 2O94 · GW | 1h 11m |
20:15 | Weymouth to Bristol Temple Meads 2V94 · GW | 1h 09m |
09:51 | London Waterloo to Southampton Central 1B23 · SW | 1h 06m |
20:09 | Paris Nord to London St Pancras (Intl) 9O59 · ES | 1h 05m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 06:00, when 49% of 234 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 25.
What ran
Formations were recorded for 15,357 trains on this date, made up of 2,221 individual units and 9,955 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,689 of the day's recorded trains from a pool of 145 units.
The average train was 5.9 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,689 | 145 |
| Class 158 | 954 | 115 |
| Class 345 | 870 | 59 |
| Class 720 | 855 | 73 |
| Class 450 | 834 | 63 |
| Class 387 | 762 | 62 |
| Class 465 | 662 | 58 |
| Class 700 | 657 | 83 |
| Class 165 | 631 | 55 |
| Class 156 | 612 | 67 |
| Class 150 | 606 | 71 |
| Class 385 | 591 | 54 |
Of 17,245 runs, 15,357 had a formation published (89%) — these are allocations rather than observations.
Buses
11,210 buses from 121 operators were seen on this date, across 2,006,902 position reports.
95,241 bus journeys were followed to their destination on this date. 56,089 arrived on time, 9,570 late, and 29,582 — 31% — arrived ahead of schedule.
That is a high early share even by bus standards, and it is a timetabling artefact rather than a fleet of speeding drivers: running time is written with enough slack to survive traffic, and most of the slack sits in the final leg where arriving early inconveniences nobody.
Averaged across every journey, buses arrived 0.5 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 95,241 | |
|---|---|---|
| On time | 56,089 | 58.9% |
| Early | 29,582 | 31.1% |
| Late | 9,570 | 10.0% |
| …more than 15 minutes late | 1,344 | 1.4% |
| Average arrival | 0.5 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 78,761 | 59% | 32% |
First Leeds FLDS | 1,211 | 57% | 31% |
Nottingham City Transport NCTR | 1,177 | 76% | 19% |
Go North East GNEL | 1,169 | 68% | 13% |
National Express NATX | 901 | 28% | 41% |
Bee Network BNML | 570 | 68% | 21% |
Bee Network BNSM | 556 | 71% | 22% |
Arriva Yorkshire WRAY | 430 | 53% | 37% |
First Bristol, Bath & the West FBRI | 425 | 63% | 26% |
West Midlands Bus WMBL | 386 | 67% | 19% |
Preston Bus PBLT | 359 | 61% | 31% |
Brighton & Hove Bus and Coach Company BHBC | 336 | 73% | 17% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (86%), and National Express furthest from it (28%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 22 Nov 2026 itself. How these figures are measured · Sources and licences