Tuesday, 24 November 2026
87% of the 22,110 passenger trains whose arrival was recorded on Tuesday, 24 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,221 recorded runs, 561 did not run at all. Among those whose arrival reached the archive, 19,197 were within five minutes, 2,690 between five and thirty minutes down, and 223 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 910 services.
Heathrow Express came closest to running to time, 99.3% of its 152 recorded arrivals; Chiltern Railways had the largest cancelled share at 8.8%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 137,529 journeys followed to their destination, 64.8% on time.
The day in numbers
| Passenger trains recorded | 26,221 | |
|---|---|---|
| Cancelled | 561 | 2.1% |
| Arrival time recorded | 22,110 | 86.2% of those that ran |
| …arrived within 5 minutes | 19,197 | 86.8% |
| …arrived 5 to 30 minutes late | 2,690 | 12.2% |
| …arrived more than 30 minutes late | 223 | 1.0% |
| Average delay at destination | 2 min |
Every percentage among the bands is of the 22,110 trains whose arrival reached the archive — not of all 26,221, and the bands are exclusive. 3,550 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
36 operators ran passenger services on this date, from ScotRail on 3,078 runs down to Caledonian Sleeper on 10. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,078 | 1% | 2,248 | 91% | 90% | 1.4 min |
Northern NT | 2,858 | 5% | 2,539 | 84% | 79% | 2.2 min |
Great Western Railway GW | 2,192 | 0% | 1,684 | 89% | 89% | 1.4 min |
Southeastern SE | 1,816 | 1% | 1,779 | 87% | 85% | 2 min |
South Western Railway SW | 1,776 | 3% | 1,549 | 87% | 84% | 1.4 min |
Southern SN | 1,714 | 1% | 1,658 | 87% | 86% | 2 min |
London Overground LO | 1,616 | 3% | 1,555 | 95% | 92% | 0.2 min |
West Midlands Railway LM | 1,337 | 1% | 1,304 | 91% | 91% | 1 min |
Greater Anglia LE | 1,313 | 0% | 1,309 | 93% | 93% | 0.3 min |
Transport for Wales AW | 1,259 | 3% | 1,021 | 90% | 87% | 0.8 min |
Thameslink TL | 990 | 5% | 557 | 69% | 63% | 5.4 min |
London Underground LT | 784 | 0% | 401 | 91% | 91% | 2.2 min |
East Midlands Railway EM | 706 | 1% | 503 | 89% | 88% | 1 min |
Elizabeth line XR | 696 | 2% | 678 | 94% | 92% | -0.6 min |
Merseyrail ME | 622 | 1% | 614 | 97% | 97% | -0.2 min |
Great Northern GN | 432 | 6% | 368 | 67% | 63% | 5.2 min |
c2c CC | 432 | 6% | 334 | 90% | 84% | 2.1 min |
Avanti West Coast VT | 424 | 2% | 310 | 48% | 47% | 9.6 min |
CrossCountry XC | 349 | 3% | 265 | 66% | 64% | 6.3 min |
TransPennine Express TP | 347 | 2% | 311 | 66% | 65% | 6.2 min |
Chiltern Railways CH | 340 | 9% | 306 | 88% | 80% | 1.6 min |
London North Eastern Railway GR | 321 | 1% | 172 | 29% | 29% | 27.9 min |
Tyne and Wear Metro TW | 174 | 0% | 173 | 94% | 94% | 1 min |
Heathrow Express HX | 152 | 0% | 152 | 99% | 99% | -0.1 min |
Island Line IL | 135 | 0% | 66 | 95% | 95% | 2 min |
Sheffield Supertram SJ | 98 | 0% | 70 | 99% | 99% | 0.4 min |
Gatwick Express GX | 72 | 0% | 69 | 71% | 71% | 3.9 min |
Eurostar ES | 49 | 0% | 49 | 73% | 73% | 6.8 min |
Charter/Other ZZ | 47 | 0% | 0 | — | — | — |
Grand Central GC | 20 | 0% | 18 | 0% | 0% | 44.1 min |
Hull Trains HT | 15 | 7% | 14 | 21% | 20% | 34.7 min |
LS LS | 13 | 0% | 5 | 60% | 60% | 7.4 min |
West Coast Railway Co WR | 12 | 0% | 0 | — | — | — |
Lumo LD | 12 | 8% | 11 | 18% | 17% | 34.5 min |
Lumo Stirling LF | 10 | 0% | 10 | 40% | 40% | 8.7 min |
Caledonian Sleeper CS | 10 | 0% | 8 | 75% | 75% | -6.1 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
910 services
This service has been delayed by a fault with the signalling system
408 services
This service has been delayed by a speed restriction
344 services
This service has been delayed by a speed restriction over defective track
296 services
This service has been delayed by congestion
292 services
This service has been delayed by a broken rail
243 services
This service has been delayed by a points failure
195 services
This service has been delayed by a problem currently under investigation
190 services
Why trains were cancelled
A reason reached the archive for 285 of the 561 cancellations (50.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
79 services
This service has been cancelled because of a late running train being in front of this one
50 services
This service has been cancelled because of forecasted slippery rails
35 services
This service has been cancelled because of slippery rails
33 services
This service has been cancelled because of congestion
26 services
This service has been cancelled because of a fault on this train
24 services
This service has been cancelled because of the emergency services dealing with an incident
21 services
This service has been cancelled because of trespassers on the railway
17 services
The longest delays
The worst of them arrived 4h 20m behind schedule — London Kings Cross to Inverness, booked away at 12:03, run by London North Eastern Railway. The ten longest range from 4h 20m down to 1h 36m, and they belong to 7 operators, London North Eastern Railway accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
12:03 | London Kings Cross to Inverness 1S15 · GR | 4h 20m |
13:05 | Edinburgh to Cardiff Central 1V64 · XC | 2h 53m |
07:18 | London Kings Cross to Hull 1H01 · HT | 2h 19m |
07:30 | London Kings Cross to Edinburgh 1S06 · GR | 2h 02m |
09:46 | Sutton (London) to St Albans 9V26 · TL | 1h 54m |
05:39 | Eastbourne to Ashford International 2D06 · SN | 1h 49m |
09:50 | Orpington to London Victoria 2D44 · SE | 1h 47m |
07:00 | Edinburgh to London Kings Cross 1E04 · GR | 1h 38m |
06:33 | London Euston to Edinburgh 9S44 · VT | 1h 37m |
06:13 | Ashford International to Eastbourne 2D03 · SN | 1h 36m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 56% of 165 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 15.
What ran
Formations were recorded for 27,348 trains on this date, made up of 2,933 individual units and 12,913 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,349 of the day's recorded trains from a pool of 223 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,349 | 223 |
| Class 465 | 1,655 | 101 |
| Class 450 | 1,521 | 116 |
| Class 720 | 1,497 | 127 |
| Class 158 | 1,390 | 136 |
| Class 150 | 1,373 | 94 |
| Class 387 | 1,354 | 96 |
| Class 345 | 1,258 | 68 |
| Class 165 | 1,164 | 62 |
| Class 156 | 1,099 | 90 |
| Class 375 | 1,033 | 103 |
| Class 700 | 1,025 | 108 |
Of 26,221 runs, 27,348 had a formation published (104%) — these are allocations rather than observations.
Buses
17,378 buses from 191 operators were seen on this date, across 3,197,327 position reports.
137,529 bus journeys were followed to their destination on this date. 89,119 arrived on time, 11,866 late, and 36,544 — 27% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.3 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 137,529 | |
|---|---|---|
| On time | 89,119 | 64.8% |
| Early | 36,544 | 26.6% |
| Late | 11,866 | 8.6% |
| …more than 15 minutes late | 1,584 | 1.2% |
| Average arrival | 0.3 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 106,053 | 67% | 27% |
Nottingham City Transport NCTR | 2,670 | 76% | 17% |
Go North East GNEL | 2,010 | 68% | 14% |
First Leeds FLDS | 1,645 | 55% | 31% |
Bee Network BNSM | 931 | 72% | 22% |
Arriva Yorkshire WRAY | 898 | 49% | 32% |
First Potteries FPOT | 820 | 52% | 37% |
National Express NATX | 762 | 35% | 35% |
First Leicester FLEI | 742 | 53% | 41% |
Preston Bus PBLT | 722 | 57% | 34% |
First Bristol, Bath & the West FBRI | 710 | 58% | 25% |
Bee Network BNML | 703 | 71% | 22% |
Of the operators with enough journeys to compare, Reading Buses ran closest to time (82%), and National Express furthest from it (35%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 24 Nov 2026 itself. How these figures are measured · Sources and licences