Thursday, 26 November 2026
87% of the 21,937 passenger trains whose arrival was recorded on Thursday, 26 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,209 recorded runs, 408 did not run at all. Among those whose arrival reached the archive, 19,085 were within five minutes, 2,705 between five and thirty minutes down, and 147 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 963 services.
Merseyrail came closest to running to time, 98.9% of its 618 recorded arrivals; c2c had the largest cancelled share at 6.9%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 141,563 journeys followed to their destination, 66.2% on time.
The day in numbers
| Passenger trains recorded | 26,209 | |
|---|---|---|
| Cancelled | 408 | 1.6% |
| Arrival time recorded | 21,937 | 85.0% of those that ran |
| …arrived within 5 minutes | 19,085 | 87.0% |
| …arrived 5 to 30 minutes late | 2,705 | 12.3% |
| …arrived more than 30 minutes late | 147 | 0.7% |
| Average delay at destination | 1.7 min |
Every percentage among the bands is of the 21,937 trains whose arrival reached the archive — not of all 26,209, and the bands are exclusive. 3,864 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,045 runs down to SO on 1. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,045 | 1% | 2,219 | 88% | 87% | 2.1 min |
Northern NT | 2,848 | 2% | 2,646 | 84% | 82% | 2.1 min |
Great Western Railway GW | 2,194 | 2% | 1,677 | 85% | 83% | 2.3 min |
Southeastern SE | 1,815 | 0% | 1,793 | 90% | 90% | 1.4 min |
South Western Railway SW | 1,782 | 1% | 1,590 | 85% | 85% | 1.6 min |
Southern SN | 1,743 | 1% | 1,694 | 85% | 84% | 2.2 min |
London Overground LO | 1,626 | 4% | 1,394 | 92% | 87% | 0.5 min |
West Midlands Railway LM | 1,333 | 1% | 1,283 | 90% | 89% | 1.3 min |
Greater Anglia LE | 1,309 | 0% | 1,301 | 94% | 94% | 0.1 min |
Transport for Wales AW | 1,251 | 2% | 1,018 | 92% | 89% | 0.1 min |
Thameslink TL | 986 | 2% | 626 | 85% | 83% | 1.8 min |
London Underground LT | 782 | 0% | 113 | 96% | 96% | 2.5 min |
East Midlands Railway EM | 707 | 1% | 499 | 79% | 77% | 2.9 min |
Elizabeth line XR | 696 | 4% | 660 | 86% | 83% | 0.6 min |
Merseyrail ME | 622 | 0% | 618 | 99% | 98% | -0.4 min |
Great Northern GN | 432 | 2% | 389 | 84% | 82% | 2.7 min |
Avanti West Coast VT | 422 | 0% | 317 | 68% | 68% | 4.4 min |
c2c CC | 420 | 7% | 334 | 94% | 86% | 1.6 min |
CrossCountry XC | 349 | 0% | 278 | 66% | 66% | 6.3 min |
TransPennine Express TP | 348 | 3% | 308 | 71% | 69% | 5.4 min |
Chiltern Railways CH | 343 | 2% | 329 | 91% | 89% | 1 min |
London North Eastern Railway GR | 319 | 0% | 199 | 80% | 80% | 0.8 min |
Tyne and Wear Metro TW | 178 | 0% | 177 | 95% | 95% | 1.1 min |
Heathrow Express HX | 152 | 0% | 138 | 94% | 94% | 1.1 min |
Island Line IL | 135 | 0% | 66 | 95% | 95% | 3.1 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 96% | 96% | 0.9 min |
Gatwick Express GX | 72 | 0% | 72 | 82% | 82% | 3.2 min |
Charter/Other ZZ | 57 | 0% | 6 | 83% | 83% | 2 min |
Eurostar ES | 52 | 0% | 49 | 37% | 37% | 21.8 min |
Grand Central GC | 20 | 0% | 20 | 45% | 45% | 8.3 min |
LS LS | 14 | 0% | 7 | 71% | 71% | 4.7 min |
Hull Trains HT | 14 | 0% | 14 | 79% | 79% | 2.2 min |
West Coast Railway Co WR | 12 | 0% | 0 | — | — | — |
Lumo LD | 12 | 0% | 12 | 75% | 75% | 4.4 min |
Lumo Stirling LF | 10 | 0% | 10 | 90% | 90% | -0.7 min |
Caledonian Sleeper CS | 6 | 0% | 6 | 67% | 67% | 0 min |
TY TY | 4 | 0% | 0 | — | — | — |
SO SO | 1 | 0% | 1 | 100% | 100% | 0 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
963 services
This service has been delayed by a speed restriction
422 services
This service has been delayed by congestion
321 services
This service has been delayed by a speed restriction over defective track
321 services
This service has been delayed by a points failure
194 services
This service has been delayed by a problem currently under investigation
177 services
This service has been delayed by a fault with the signalling system
162 services
This service has been delayed by an operational incident
105 services
Why trains were cancelled
A reason reached the archive for 181 of the 408 cancellations (44.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
40 services
This service has been cancelled because of congestion
25 services
This service has been cancelled because of the emergency services dealing with an incident
20 services
This service has been cancelled because of a points failure
20 services
This service has been cancelled because of a late running train being in front of this one
20 services
This service has been cancelled because of a broken down train
20 services
This service has been cancelled because of engineering works not being finished on time
18 services
This service has been cancelled because of a fault on a train
18 services
The longest delays
The worst of them arrived 2h 15m behind schedule — Clitheroe to Rochdale, booked away at 08:21, run by Northern. The ten longest range from 2h 15m down to 1h 21m, and they belong to 7 operators, Northern accounting for 2. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
08:21 | Clitheroe to Rochdale 2J25 · NT | 2h 15m |
08:26 | Cleethorpes to Liverpool Lime Street 1B71 · TP | 2h 13m |
13:54 | Liverpool Lime Street to Hull 1K23 · TP | 2h 00m |
08:01 | Shanklin to Ryde St Johns Road 2U14 · IL | 1h 58m |
23:38 | Tower Hill Underground to Kensington High St Underground 2O02 · LT | 1h 52m |
13:57 | Wemyss Bay to Glasgow Central 2W30 · SR | 1h 37m |
09:31 | London St Pancras (Intl) to Paris Nord 9O14 · ES | 1h 36m |
18:01 | London St Pancras (Intl) to Paris Nord 9O46 · ES | 1h 36m |
20:05 | Leeds to Nottingham 1Y33 · NT | 1h 22m |
15:03 | London Paddington to Penzance 1C86 · GW | 1h 21m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 51% of 158 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 20.
What ran
Formations were recorded for 27,430 trains on this date, made up of 2,923 individual units and 12,886 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,374 of the day's recorded trains from a pool of 222 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,374 | 222 |
| Class 465 | 1,650 | 101 |
| Class 450 | 1,510 | 118 |
| Class 720 | 1,494 | 128 |
| Class 158 | 1,375 | 131 |
| Class 387 | 1,353 | 94 |
| Class 150 | 1,299 | 93 |
| Class 345 | 1,260 | 69 |
| Class 165 | 1,166 | 61 |
| Class 156 | 1,147 | 88 |
| Class 375 | 1,026 | 99 |
| Class 700 | 1,020 | 106 |
Of 26,209 runs, 27,430 had a formation published (105%) — these are allocations rather than observations.
Buses
17,487 buses from 190 operators were seen on this date, across 3,222,291 position reports.
141,563 bus journeys were followed to their destination on this date. 93,734 arrived on time, 12,228 late, and 35,601 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 141,563 | |
|---|---|---|
| On time | 93,734 | 66.2% |
| Early | 35,601 | 25.1% |
| Late | 12,228 | 8.6% |
| …more than 15 minutes late | 1,588 | 1.1% |
| Average arrival | 0.2 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 109,785 | 68% | 25% |
Nottingham City Transport NCTR | 2,848 | 78% | 18% |
Go North East GNEL | 2,030 | 69% | 14% |
First Leeds FLDS | 1,648 | 58% | 27% |
Bee Network BNSM | 910 | 73% | 21% |
Arriva Yorkshire WRAY | 874 | 51% | 32% |
First Potteries FPOT | 807 | 49% | 38% |
National Express NATX | 760 | 31% | 37% |
First Leicester FLEI | 753 | 55% | 39% |
Preston Bus PBLT | 733 | 55% | 33% |
Bee Network BNML | 704 | 70% | 25% |
First Bristol, Bath & the West FBRI | 703 | 59% | 25% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (83%), and National Express furthest from it (31%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 26 Nov 2026 itself. How these figures are measured · Sources and licences