Wednesday, 18 November 2026
90% of the 22,156 passenger trains whose arrival was recorded on Wednesday, 18 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,202 recorded runs, 655 did not run at all. Among those whose arrival reached the archive, 19,886 were within five minutes, 2,147 between five and thirty minutes down, and 123 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 726 services.
Heathrow Express came closest to running to time, 99.3% of its 152 recorded arrivals; c2c had the largest cancelled share at 12.5%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 138,781 journeys followed to their destination, 70.7% on time.
The day in numbers
| Passenger trains recorded | 26,202 | |
|---|---|---|
| Cancelled | 655 | 2.5% |
| Arrival time recorded | 22,156 | 86.7% of those that ran |
| …arrived within 5 minutes | 19,886 | 89.8% |
| …arrived 5 to 30 minutes late | 2,147 | 9.7% |
| …arrived more than 30 minutes late | 123 | 0.6% |
| Average delay at destination | 1.3 min |
Every percentage among the bands is of the 22,156 trains whose arrival reached the archive — not of all 26,202, and the bands are exclusive. 3,391 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
36 operators ran passenger services on this date, from ScotRail on 3,030 runs down to Caledonian Sleeper on 6. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,030 | 0% | 2,255 | 94% | 93% | 1 min |
Northern NT | 2,838 | 10% | 2,448 | 93% | 83% | 0.9 min |
Great Western Railway GW | 2,196 | 1% | 1,705 | 88% | 87% | 1.6 min |
Southeastern SE | 1,828 | 1% | 1,787 | 86% | 85% | 1.7 min |
South Western Railway SW | 1,764 | 2% | 1,558 | 87% | 86% | 1.8 min |
Southern SN | 1,713 | 2% | 1,658 | 88% | 87% | 1.5 min |
London Overground LO | 1,613 | 2% | 1,581 | 96% | 94% | 0.1 min |
West Midlands Railway LM | 1,334 | 1% | 1,290 | 90% | 89% | 1.7 min |
Greater Anglia LE | 1,310 | 0% | 1,303 | 97% | 96% | -0.1 min |
Transport for Wales AW | 1,281 | 5% | 975 | 94% | 88% | -0.3 min |
Thameslink TL | 991 | 2% | 635 | 83% | 81% | 2 min |
London Underground LT | 784 | 0% | 409 | 94% | 94% | 1.7 min |
East Midlands Railway EM | 749 | 1% | 495 | 77% | 75% | 4.2 min |
Elizabeth line XR | 696 | 0% | 694 | 97% | 97% | -1 min |
Merseyrail ME | 622 | 1% | 613 | 97% | 96% | -0.1 min |
Great Northern GN | 432 | 1% | 391 | 83% | 82% | 2 min |
Avanti West Coast VT | 420 | 1% | 314 | 57% | 56% | 6.9 min |
c2c CC | 415 | 13% | 305 | 88% | 75% | 1.9 min |
CrossCountry XC | 355 | 3% | 265 | 60% | 58% | 11.3 min |
TransPennine Express TP | 344 | 5% | 302 | 80% | 76% | 2.6 min |
Chiltern Railways CH | 341 | 4% | 325 | 98% | 94% | -0.2 min |
London North Eastern Railway GR | 319 | 0% | 200 | 75% | 75% | 2.7 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 92% | 92% | 1.2 min |
Heathrow Express HX | 152 | 0% | 152 | 99% | 99% | -0.3 min |
Island Line IL | 135 | 0% | 66 | 100% | 100% | -0.8 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 95% | 95% | 1.2 min |
Gatwick Express GX | 72 | 8% | 66 | 74% | 68% | 3.9 min |
Charter/Other ZZ | 64 | 0% | 4 | 50% | 50% | 6 min |
Eurostar ES | 48 | 0% | 48 | 83% | 83% | 3.4 min |
Grand Central GC | 20 | 5% | 19 | 63% | 60% | 4.6 min |
Hull Trains HT | 15 | 0% | 15 | 73% | 73% | 4.9 min |
West Coast Railway Co WR | 14 | 0% | 2 | 100% | 100% | 1 min |
Lumo LD | 11 | 0% | 11 | 82% | 82% | 7.2 min |
Lumo Stirling LF | 10 | 0% | 10 | 70% | 70% | 6.8 min |
LS LS | 8 | 0% | 1 | 0% | 0% | 203 min |
Caledonian Sleeper CS | 6 | 0% | 6 | 67% | 67% | 17.3 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 90% and 87% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
726 services
This service has been delayed by a speed restriction
592 services
This service has been delayed by congestion
306 services
This service has been delayed by a speed restriction over defective track
299 services
This service has been delayed by a fault with the signalling system
205 services
This service has been delayed by a problem currently under investigation
145 services
This service has been delayed by slippery rails
138 services
This service has been delayed by a late running freight train
122 services
Why trains were cancelled
A reason reached the archive for 491 of the 655 cancellations (75.0%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted slippery rails
216 services
This service has been cancelled because of a fault with the signalling system
88 services
This service has been cancelled because of a landslip
52 services
This service has been cancelled because of a speed restriction
40 services
This service has been cancelled because of a late running freight train
27 services
This service has been cancelled because of a fault on this train
24 services
This service has been cancelled because of a late running train being in front of this one
23 services
This service has been cancelled because of a safety inspection of the track
21 services
The longest delays
The worst of them arrived 3h 44m behind schedule — Bournemouth to Birmingham New Street, booked away at 19:45, run by CrossCountry. The ten longest range from 3h 44m down to 1h 17m, and they belong to 7 operators, CrossCountry accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
19:45 | Bournemouth to Birmingham New Street 1M78 · XC | 3h 44m |
09:42 | ELGHBRM to CREWDHS 5K47 · LS | 3h 23m |
13:45 | Bournemouth to Manchester Piccadilly 1M54 · XC | 1h 38m |
23:40 | Edinburgh to Carstairs 1C11 · CS | 1h 36m |
15:34 | Birmingham New Street to Liverpool Lime Street 1F62 · LM | 1h 27m |
21:37 | Liverpool Lime Street to Nottingham 1L21 · EM | 1h 26m |
14:00 | Bristol Temple Meads to Manchester Piccadilly 1M49 · XC | 1h 23m |
09:25 | Manchester Piccadilly to Bournemouth 1O12 · XC | 1h 21m |
21:19 | Liverpool Lime Street to Doncaster 1B96 · TP | 1h 19m |
20:56 | Worcester Foregate Street to London Paddington 1P44 · GW | 1h 17m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 56% of 165 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 15.
What ran
Formations were recorded for 27,346 trains on this date, made up of 2,900 individual units and 12,778 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,370 of the day's recorded trains from a pool of 224 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,370 | 224 |
| Class 465 | 1,624 | 99 |
| Class 450 | 1,508 | 121 |
| Class 720 | 1,489 | 128 |
| Class 158 | 1,358 | 130 |
| Class 387 | 1,347 | 93 |
| Class 150 | 1,288 | 91 |
| Class 345 | 1,254 | 68 |
| Class 165 | 1,150 | 60 |
| Class 156 | 1,084 | 89 |
| Class 700 | 1,046 | 108 |
| Class 385 | 1,000 | 66 |
Of 26,202 runs, 27,346 had a formation published (104%) — these are allocations rather than observations.
Buses
17,412 buses from 189 operators were seen on this date, across 3,190,423 position reports.
138,781 bus journeys were followed to their destination on this date. 98,104 arrived on time, 8,104 late, and 32,573 — 23% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 976 journeys finished more than fifteen minutes down.
| Journeys followed to destination | 138,781 | |
|---|---|---|
| On time | 98,104 | 70.7% |
| Early | 32,573 | 23.5% |
| Late | 8,104 | 5.8% |
| …more than 15 minutes late | 976 | 0.7% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 105,615 | 73% | 24% |
Nottingham City Transport NCTR | 2,372 | 78% | 17% |
First South Yorkshire FSYO | 2,253 | 59% | 24% |
Go North East GNEL | 2,055 | 71% | 11% |
First Leeds FLDS | 1,671 | 59% | 28% |
First Bristol, Bath & the West FBRI | 1,644 | 57% | 27% |
Arriva Yorkshire WRAY | 944 | 58% | 26% |
Bee Network BNSM | 915 | 78% | 19% |
First Potteries FPOT | 829 | 58% | 32% |
First Leicester FLEI | 772 | 61% | 34% |
National Express NATX | 766 | 32% | 36% |
Bee Network BNML | 716 | 73% | 18% |
Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (89%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 18 Nov 2026 itself. How these figures are measured · Sources and licences