Tuesday, 17 November 2026
Tuesday, 17 November 2026 was a poor day on the railway: of the 21,865 passenger trains whose arrival was recorded, 84% were within five minutes, and a further 856 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
3,367 trains arrived more than five minutes late and 169 more than half an hour, against 18,329 that ran to time. The average delay across every train whose arrival was recorded was 2.2 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 854 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,665 booked departures and an average delay of 3.4 minutes.
Buses on this date: 139,547 journeys followed to their destination, 70.4% on time.
The day in numbers
| Passenger trains recorded | 26,255 | |
|---|---|---|
| Cancelled | 856 | 3.3% |
| Arrival time recorded | 21,865 | 86.1% of those that ran |
| …arrived within 5 minutes | 18,329 | 83.8% |
| …arrived 5 to 30 minutes late | 3,367 | 15.4% |
| …arrived more than 30 minutes late | 169 | 0.8% |
| Average delay at destination | 2.2 min |
Every percentage among the bands is of the 21,865 trains whose arrival reached the archive — not of all 26,255, and the bands are exclusive. 3,534 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
36 operators ran passenger services on this date, from ScotRail on 3,060 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,060 | 0% | 2,254 | 91% | 91% | 1.4 min |
Northern NT | 2,849 | 12% | 2,376 | 81% | 71% | 2.5 min |
Great Western Railway GW | 2,200 | 1% | 1,708 | 86% | 85% | 1.7 min |
Southeastern SE | 1,831 | 3% | 1,742 | 78% | 76% | 3.1 min |
South Western Railway SW | 1,762 | 4% | 1,504 | 81% | 78% | 2.4 min |
Southern SN | 1,704 | 2% | 1,648 | 85% | 84% | 1.9 min |
London Overground LO | 1,614 | 3% | 1,534 | 94% | 91% | 0.5 min |
West Midlands Railway LM | 1,335 | 2% | 1,285 | 87% | 85% | 1.8 min |
Greater Anglia LE | 1,314 | 0% | 1,302 | 93% | 92% | 0.4 min |
Transport for Wales AW | 1,271 | 2% | 1,036 | 86% | 83% | 1.4 min |
Thameslink TL | 992 | 3% | 621 | 80% | 77% | 2.4 min |
London Underground LT | 784 | 0% | 407 | 89% | 89% | 2.2 min |
East Midlands Railway EM | 748 | 1% | 491 | 71% | 70% | 4.7 min |
Elizabeth line XR | 703 | 5% | 657 | 82% | 78% | 1.9 min |
Merseyrail ME | 622 | 1% | 609 | 98% | 97% | -0.4 min |
Great Northern GN | 432 | 2% | 389 | 78% | 76% | 3 min |
c2c CC | 425 | 12% | 269 | 56% | 47% | 7.6 min |
Avanti West Coast VT | 420 | 1% | 310 | 49% | 49% | 9.1 min |
Chiltern Railways CH | 354 | 9% | 320 | 95% | 87% | 0.6 min |
CrossCountry XC | 350 | 4% | 261 | 56% | 53% | 7.4 min |
TransPennine Express TP | 347 | 6% | 294 | 61% | 56% | 6.8 min |
London North Eastern Railway GR | 319 | 0% | 200 | 43% | 43% | 10.5 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 99% | 99% | 0.7 min |
Heathrow Express HX | 152 | 0% | 146 | 91% | 91% | 1.8 min |
Island Line IL | 135 | 0% | 66 | 100% | 100% | -0.8 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 92% | 92% | 0.6 min |
Gatwick Express GX | 72 | 0% | 72 | 81% | 81% | 3.4 min |
Charter/Other ZZ | 48 | 0% | 0 | — | — | — |
Eurostar ES | 48 | 0% | 47 | 57% | 57% | 9 min |
Grand Central GC | 22 | 9% | 19 | 42% | 38% | 12.7 min |
West Coast Railway Co WR | 17 | 0% | 6 | 33% | 33% | 40.3 min |
Hull Trains HT | 15 | 0% | 15 | 53% | 53% | 5.3 min |
Lumo Stirling LF | 10 | 0% | 10 | 50% | 50% | 7.4 min |
Lumo LD | 10 | 0% | 10 | 70% | 70% | 7.3 min |
Caledonian Sleeper CS | 10 | 0% | 8 | 50% | 50% | -1.5 min |
LS LS | 8 | 0% | 1 | 0% | 0% | 62 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 84% and 81% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
854 services
This service has been delayed by slippery rails
605 services
This service has been delayed by a speed restriction
481 services
This service has been delayed by congestion
480 services
This service has been delayed by a speed restriction over defective track
352 services
This service has been delayed by a fault with the signalling system
338 services
This service has been delayed by a fault on a train
298 services
This service has been delayed by a problem currently under investigation
209 services
Why trains were cancelled
A reason reached the archive for 516 of the 856 cancellations (60.3%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
237 services
This service has been cancelled because of forecasted slippery rails
129 services
This service has been cancelled because of congestion
34 services
This service has been cancelled because of the emergency services dealing with an incident earlier today
24 services
This service has been cancelled because of slippery rails
24 services
This service has been cancelled because of a late running train being in front of this one
24 services
This service has been cancelled because of a fault on a train
24 services
This service has been cancelled because of a fault on this train
20 services
The longest delays
The worst of them arrived 2h 38m behind schedule — CRNFSTM to Scarborough, booked away at 05:03, run by West Coast Railway Co. The ten longest range from 2h 38m down to 1h 14m, and they belong to 5 operators, Southeastern accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
05:03 | CRNFSTM to Scarborough 5Z57 · WR | 2h 38m |
07:51 | Barton-on-Humber to Cleethorpes 2F82 · EM | 1h 56m |
07:19 | Gravesend to London Victoria 2U60 · SE | 1h 48m |
07:49 | Gravesend to London Victoria 2U62 · SE | 1h 44m |
07:53 | Dartford to London Charing Cross 2C14 · SE | 1h 42m |
07:57 | Barnehurst to London Cannon Street 2C85 · SE | 1h 35m |
06:25 | Manchester Airport to Holyhead 1D31 · AW | 1h 31m |
05:25 | Manchester Airport to Holyhead 1D30 · AW | 1h 19m |
10:34 | London Fenchurch Street to Shoeburyness 2B76 · CC | 1h 14m |
10:49 | London Fenchurch Street to Shoeburyness 1B42 · CC | 1h 14m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 54% of 166 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 15.
What ran
Formations were recorded for 27,329 trains on this date, made up of 2,898 individual units and 12,768 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,360 of the day's recorded trains from a pool of 224 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,360 | 224 |
| Class 465 | 1,638 | 99 |
| Class 720 | 1,494 | 124 |
| Class 450 | 1,483 | 116 |
| Class 387 | 1,361 | 93 |
| Class 158 | 1,338 | 133 |
| Class 150 | 1,309 | 91 |
| Class 345 | 1,275 | 67 |
| Class 165 | 1,122 | 60 |
| Class 156 | 1,079 | 87 |
| Class 700 | 1,029 | 109 |
| Class 385 | 1,001 | 67 |
Of 26,255 runs, 27,329 had a formation published (104%) — these are allocations rather than observations.
Buses
17,393 buses from 188 operators were seen on this date, across 3,161,689 position reports.
139,547 bus journeys were followed to their destination on this date. 98,293 arrived on time, 8,143 late, and 33,111 — 24% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 1,089 journeys finished more than fifteen minutes down.
| Journeys followed to destination | 139,547 | |
|---|---|---|
| On time | 98,293 | 70.4% |
| Early | 33,111 | 23.7% |
| Late | 8,143 | 5.8% |
| …more than 15 minutes late | 1,089 | 0.8% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 106,781 | 73% | 24% |
Nottingham City Transport NCTR | 2,445 | 78% | 16% |
First South Yorkshire FSYO | 2,256 | 57% | 26% |
Go North East GNEL | 2,077 | 71% | 11% |
First Leeds FLDS | 1,624 | 58% | 28% |
First Bristol, Bath & the West FBRI | 1,566 | 54% | 30% |
Bee Network BNSM | 937 | 77% | 18% |
Arriva Yorkshire WRAY | 896 | 57% | 25% |
First Potteries FPOT | 797 | 52% | 32% |
National Express NATX | 778 | 32% | 36% |
First Leicester FLEI | 754 | 58% | 38% |
Preston Bus PBLT | 716 | 63% | 30% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (89%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 17 Nov 2026 itself. How these figures are measured · Sources and licences