Monday, 16 November 2026
Monday, 16 November 2026 was a poor day on the railway: of the 21,544 passenger trains whose arrival was recorded, 85% were within five minutes, and a further 836 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
2,956 trains arrived more than five minutes late and 172 more than half an hour, against 18,416 that ran to time. The average delay across every train whose arrival was recorded was 2.1 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 700 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,673 booked departures and an average delay of 2.3 minutes.
Buses on this date: 136,096 journeys followed to their destination, 69.8% on time.
The day in numbers
| Passenger trains recorded | 26,279 | |
|---|---|---|
| Cancelled | 836 | 3.2% |
| Arrival time recorded | 21,544 | 84.7% of those that ran |
| …arrived within 5 minutes | 18,416 | 85.5% |
| …arrived 5 to 30 minutes late | 2,956 | 13.7% |
| …arrived more than 30 minutes late | 172 | 0.8% |
| Average delay at destination | 2.1 min |
Every percentage among the bands is of the 21,544 trains whose arrival reached the archive — not of all 26,279, and the bands are exclusive. 3,899 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
36 operators ran passenger services on this date, from ScotRail on 3,062 runs down to West Coast Railway Co on 5. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,062 | 1% | 2,192 | 90% | 88% | 1.7 min |
Northern NT | 2,841 | 7% | 2,525 | 85% | 78% | 1.9 min |
Great Western Railway GW | 2,183 | 1% | 1,702 | 88% | 87% | 1.4 min |
Southeastern SE | 1,811 | 6% | 1,633 | 76% | 71% | 4.4 min |
South Western Railway SW | 1,781 | 4% | 1,531 | 85% | 80% | 1.9 min |
Southern SN | 1,703 | 4% | 1,596 | 86% | 82% | 1.9 min |
London Overground LO | 1,608 | 2% | 1,557 | 96% | 94% | 0 min |
Greater Anglia LE | 1,412 | 0% | 1,271 | 93% | 93% | 0.3 min |
West Midlands Railway LM | 1,332 | 3% | 1,191 | 84% | 81% | 2.1 min |
Transport for Wales AW | 1,259 | 3% | 1,022 | 88% | 85% | 0.8 min |
Thameslink TL | 992 | 5% | 540 | 85% | 78% | 1.8 min |
London Underground LT | 776 | 0% | 365 | 92% | 92% | 1.6 min |
East Midlands Railway EM | 743 | 1% | 482 | 74% | 73% | 3.9 min |
Elizabeth line XR | 697 | 4% | 658 | 91% | 88% | 0.1 min |
Merseyrail ME | 624 | 1% | 618 | 98% | 97% | -0.2 min |
Great Northern GN | 439 | 2% | 376 | 79% | 77% | 3.2 min |
Avanti West Coast VT | 418 | 0% | 317 | 48% | 48% | 7.5 min |
c2c CC | 410 | 13% | 306 | 88% | 75% | 1.9 min |
CrossCountry XC | 353 | 3% | 261 | 54% | 53% | 9.2 min |
Chiltern Railways CH | 350 | 9% | 301 | 95% | 86% | 0.6 min |
TransPennine Express TP | 336 | 3% | 301 | 67% | 65% | 4.9 min |
London North Eastern Railway GR | 321 | 2% | 188 | 60% | 57% | 8.7 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 90% | 90% | 1.7 min |
Heathrow Express HX | 152 | 0% | 152 | 97% | 97% | 0.2 min |
Island Line IL | 135 | 0% | 49 | 86% | 86% | 19.9 min |
Sheffield Supertram SJ | 97 | 0% | 73 | 100% | 100% | 0.2 min |
Gatwick Express GX | 79 | 10% | 49 | 73% | 63% | 6.1 min |
Eurostar ES | 54 | 0% | 47 | 47% | 47% | 25.6 min |
Charter/Other ZZ | 50 | 0% | 0 | — | — | — |
Grand Central GC | 21 | 5% | 20 | 40% | 38% | 9.4 min |
LS LS | 15 | 0% | 6 | 17% | 17% | 30.3 min |
Hull Trains HT | 15 | 0% | 15 | 73% | 73% | 5.7 min |
Lumo LD | 11 | 18% | 9 | 56% | 45% | 13.7 min |
Lumo Stirling LF | 10 | 10% | 9 | 67% | 60% | 19.9 min |
Caledonian Sleeper CS | 10 | 10% | 7 | 71% | 63% | -2 min |
West Coast Railway Co WR | 5 | 0% | 1 | 100% | 100% | 4 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 82% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
700 services
This service has been delayed by congestion
457 services
This service has been delayed by a fault with the signalling system
384 services
This service has been delayed by a person being hit by a train
356 services
This service has been delayed by a speed restriction
319 services
This service has been delayed by a speed restriction over defective track
246 services
This service has been delayed by trespassers on the railway
232 services
This service has been delayed by a fault on a train earlier
185 services
Why trains were cancelled
A reason reached the archive for 538 of the 836 cancellations (64.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
188 services
This service has been cancelled because of trespassers on the railway
79 services
This service has been cancelled because of forecasted slippery rails
71 services
This service has been cancelled because of a person being hit by a train
71 services
This service has been cancelled because of a fault on a train earlier
41 services
This service has been cancelled because of slippery rails
38 services
This service has been cancelled because of a points failure
26 services
This service has been cancelled because of trespassers on the railway earlier today
24 services
The longest delays
The worst of them arrived 3h 30m behind schedule — Shanklin to Ryde St Johns Road, booked away at 09:01, run by Island Line. The ten longest range from 3h 30m down to 1h 57m, and they belong to 3 operators, Island Line accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
09:01 | Shanklin to Ryde St Johns Road 2U18 · IL | 3h 30m |
08:01 | Shanklin to Ryde St Johns Road 2U14 · IL | 3h 30m |
08:34 | Ryde St Johns Road to Shanklin 2D17 · IL | 3h 28m |
07:34 | Ryde St Johns Road to Shanklin 2D13 · IL | 3h 28m |
19:24 | Paris Nord to London St Pancras (Intl) 9O57 · ES | 2h 43m |
18:26 | Hayes (Kent) to London Charing Cross 1K22 · SE | 2h 41m |
20:09 | Paris Nord to London St Pancras (Intl) 9O59 · ES | 2h 35m |
19:04 | London Charing Cross to Dover Priory 2R60 · SE | 2h 19m |
18:09 | Paris Nord to London St Pancras (Intl) 9O51 · ES | 2h 11m |
20:07 | Ryde St Johns Road to Shanklin 2D63 · IL | 1h 57m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 53% of 104 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.
What ran
Formations were recorded for 26,897 trains on this date, made up of 2,911 individual units and 12,809 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,302 of the day's recorded trains from a pool of 224 units.
The average train was 5.6 vehicles long. The longest formation recorded was 18 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,302 | 224 |
| Class 465 | 1,615 | 101 |
| Class 720 | 1,511 | 130 |
| Class 450 | 1,498 | 119 |
| Class 387 | 1,326 | 94 |
| Class 158 | 1,314 | 134 |
| Class 150 | 1,245 | 86 |
| Class 345 | 1,239 | 66 |
| Class 165 | 1,145 | 61 |
| Class 156 | 1,102 | 90 |
| Class 700 | 1,013 | 105 |
| Class 375 | 1,006 | 103 |
Of 26,279 runs, 26,897 had a formation published (102%) — these are allocations rather than observations.
Buses
17,395 buses from 189 operators were seen on this date, across 3,124,431 position reports.
136,096 bus journeys were followed to their destination on this date. 94,944 arrived on time, 7,007 late, and 34,145 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 136,096 | |
|---|---|---|
| On time | 94,944 | 69.8% |
| Early | 34,145 | 25.1% |
| Late | 7,007 | 5.1% |
| …more than 15 minutes late | 760 | 0.6% |
| Average arrival | 0.2 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 102,872 | 72% | 26% |
Nottingham City Transport NCTR | 2,565 | 79% | 17% |
First South Yorkshire FSYO | 2,328 | 60% | 26% |
Go North East GNEL | 2,082 | 76% | 11% |
First Leeds FLDS | 1,677 | 60% | 28% |
First Bristol, Bath & the West FBRI | 1,591 | 56% | 29% |
Bee Network BNSM | 956 | 79% | 17% |
Arriva Yorkshire WRAY | 904 | 61% | 27% |
First Potteries FPOT | 816 | 58% | 33% |
National Express NATX | 772 | 32% | 37% |
First Leicester FLEI | 763 | 62% | 35% |
Preston Bus PBLT | 714 | 59% | 31% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (90%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 16 Nov 2026 itself. How these figures are measured · Sources and licences