Sunday, 15 November 2026
85% of the 12,600 passenger trains whose arrival was recorded on Sunday, 15 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 17,534 recorded runs, 302 did not run at all. Among those whose arrival reached the archive, 10,766 were within five minutes, 1,722 between five and thirty minutes down, and 112 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 380 services.
Elizabeth line came closest to running to time, 98.0% of its 493 recorded arrivals; CrossCountry had the largest cancelled share at 13.5%.
A weekend timetable, so the 17,534 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
Buses on this date: 95,548 journeys followed to their destination, 64.8% on time.
The day in numbers
| Passenger trains recorded | 17,534 | |
|---|---|---|
| Cancelled | 302 | 1.7% |
| Arrival time recorded | 12,600 | 73.1% of those that ran |
| …arrived within 5 minutes | 10,766 | 85.4% |
| …arrived 5 to 30 minutes late | 1,722 | 13.7% |
| …arrived more than 30 minutes late | 112 | 0.9% |
| Average delay at destination | 2 min |
Every percentage among the bands is of the 12,600 trains whose arrival reached the archive — not of all 17,534, and the bands are exclusive. 4,632 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 1,689 runs down to LS on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 1,689 | 1% | 1,090 | 89% | 87% | 1.7 min |
South Western Railway SW | 1,492 | 0% | 734 | 87% | 86% | 2 min |
Northern NT | 1,434 | 1% | 1,191 | 81% | 80% | 2.5 min |
Southern SN | 1,377 | 3% | 929 | 82% | 79% | 2.5 min |
Great Western Railway GW | 1,238 | 2% | 906 | 82% | 80% | 2.4 min |
London Overground LO | 1,166 | 3% | 1,075 | 93% | 90% | 0.4 min |
Southeastern SE | 1,128 | 0% | 927 | 80% | 80% | 2.7 min |
Greater Anglia LE | 1,086 | 0% | 817 | 95% | 95% | 0 min |
Transport for Wales AW | 915 | 1% | 689 | 89% | 88% | 0.9 min |
Thameslink TL | 724 | 7% | 337 | 79% | 69% | 3.3 min |
London Underground LT | 655 | 0% | 286 | 89% | 89% | 2.4 min |
West Midlands Railway LM | 646 | 1% | 625 | 81% | 80% | 2.7 min |
Elizabeth line XR | 520 | 4% | 493 | 98% | 94% | -0.8 min |
TransPennine Express TP | 489 | 1% | 290 | 88% | 86% | 0.2 min |
East Midlands Railway EM | 436 | 2% | 309 | 80% | 78% | 2.5 min |
Merseyrail ME | 387 | 2% | 311 | 98% | 95% | 0.4 min |
Great Northern GN | 306 | 0% | 244 | 93% | 93% | 0.6 min |
Avanti West Coast VT | 291 | 1% | 218 | 32% | 31% | 13.4 min |
CrossCountry XC | 229 | 14% | 130 | 68% | 55% | 5.8 min |
London North Eastern Railway GR | 221 | 3% | 160 | 69% | 67% | 7.7 min |
c2c CC | 211 | 0% | 145 | 97% | 97% | 0.9 min |
Chiltern Railways CH | 193 | 3% | 188 | 95% | 93% | 0.4 min |
Heathrow Express HX | 151 | 0% | 151 | 95% | 95% | 0.1 min |
Island Line IL | 135 | 0% | 0 | — | — | — |
Tyne and Wear Metro TW | 128 | 0% | 126 | 87% | 87% | 2.1 min |
Gatwick Express GX | 72 | 0% | 72 | 89% | 89% | 1.2 min |
Eurostar ES | 53 | 0% | 53 | 70% | 70% | 8.1 min |
Sheffield Supertram SJ | 51 | 0% | 51 | 98% | 98% | 0 min |
Charter/Other ZZ | 32 | 0% | 0 | — | — | — |
Grand Central GC | 21 | 10% | 16 | 38% | 33% | 28.2 min |
West Coast Railway Co WR | 12 | 0% | 2 | 100% | 100% | -51.5 min |
Hull Trains HT | 12 | 0% | 12 | 75% | 75% | 2.3 min |
Lumo LD | 11 | 9% | 8 | 63% | 56% | 1.4 min |
Lumo Stirling LF | 8 | 0% | 8 | 13% | 13% | 31 min |
Caledonian Sleeper CS | 7 | 0% | 6 | 67% | 67% | 1.3 min |
TY TY | 6 | 0% | 0 | — | — | — |
LS LS | 2 | 0% | 1 | 0% | 0% | 77 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 83% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
380 services
This service has been delayed by congestion
341 services
This service has been delayed by a tunnel being closed for safety reasons
160 services
This service has been delayed by a speed restriction over defective track
149 services
This service has been delayed by a fault with the signalling system
132 services
This service has been delayed by a speed restriction
128 services
This service has been delayed by a points failure
82 services
This service has been delayed by slippery rails
79 services
Why trains were cancelled
A reason reached the archive for 181 of the 302 cancellations (59.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a tunnel being closed for safety reasons
69 services
This service has been cancelled because of a shortage of train drivers
30 services
This service has been cancelled because of engineering works not being finished on time
17 services
This service has been cancelled because of a fault with the signalling system
16 services
This service has been cancelled because of urgent repairs to the track
13 services
This service has been cancelled because of damage to the overhead electric wires
13 services
This service has been cancelled because of a points failure
12 services
This service has been cancelled because of a late running train being in front of this one
11 services
The longest delays
The worst of them arrived 4h 03m behind schedule — London Kings Cross to Sunderland, booked away at 10:00, run by Grand Central. The ten longest range from 4h 03m down to 1h 20m, and they belong to 6 operators, London North Eastern Railway accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
10:00 | London Kings Cross to Sunderland 1N90 · GC | 4h 03m |
18:00 | Edinburgh to London Kings Cross 1E26 · GR | 2h 33m |
11:03 | London Kings Cross to Edinburgh 1S13 · GR | 2h 09m |
10:03 | Birmingham New Street to Edinburgh 1S39 · XC | 1h 56m |
18:03 | London Kings Cross to Edinburgh 1S27 · GR | 1h 56m |
12:30 | Sunderland to London Kings Cross 1A65 · GC | 1h 41m |
07:49 | Exeter St Davids to Basingstoke 1L32 · SW | 1h 34m |
16:38 | Glasgow Central to London Euston 1M17 · VT | 1h 31m |
11:31 | Bristol Temple Meads to Aberdeen 1S45 · XC | 1h 21m |
12:40 | Amsterdam CS to London St Pancras (Intl) 9I43 · ES | 1h 20m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 05:00, when 34% of 101 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 23.
What ran
Formations were recorded for 14,864 trains on this date, made up of 2,208 individual units and 9,859 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,637 of the day's recorded trains from a pool of 146 units.
The average train was 5.8 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,637 | 146 |
| Class 345 | 904 | 58 |
| Class 720 | 893 | 87 |
| Class 158 | 871 | 115 |
| Class 387 | 854 | 73 |
| Class 700 | 712 | 84 |
| Class 150 | 689 | 65 |
| Class 165 | 603 | 52 |
| Class 450 | 572 | 81 |
| Class 385 | 568 | 57 |
| Class 375 | 565 | 67 |
| Class 170 | 555 | 86 |
Of 17,534 runs, 14,864 had a formation published (85%) — these are allocations rather than observations.
Buses
11,239 buses from 119 operators were seen on this date, across 1,964,651 position reports.
95,548 bus journeys were followed to their destination on this date. 61,942 arrived on time, 6,786 late, and 26,820 — 28% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 95,548 | |
|---|---|---|
| On time | 61,942 | 64.8% |
| Early | 26,820 | 28.1% |
| Late | 6,786 | 7.1% |
| …more than 15 minutes late | 590 | 0.6% |
| Average arrival | 0.1 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 76,944 | 65% | 29% |
Nottingham City Transport NCTR | 1,747 | 79% | 17% |
Go North East GNEL | 1,240 | 71% | 9% |
First Leeds FLDS | 1,232 | 60% | 26% |
First Bristol, Bath & the West FBRI | 1,219 | 64% | 22% |
First South Yorkshire FSYO | 1,170 | 60% | 24% |
National Express NATX | 905 | 31% | 39% |
Bee Network BNML | 569 | 74% | 17% |
Bee Network BNSM | 559 | 78% | 17% |
Arriva Yorkshire WRAY | 433 | 63% | 29% |
Brighton & Hove Bus and Coach Company BHBC | 357 | 76% | 16% |
Preston Bus PBLT | 347 | 71% | 22% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (31%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 15 Nov 2026 itself. How these figures are measured · Sources and licences