TransitRadar

Sunday, 15 November 2026

85% of the 12,600 passenger trains whose arrival was recorded on Sunday, 15 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 17,534 recorded runs, 302 did not run at all. Among those whose arrival reached the archive, 10,766 were within five minutes, 1,722 between five and thirty minutes down, and 112 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 380 services.

Elizabeth line came closest to running to time, 98.0% of its 493 recorded arrivals; CrossCountry had the largest cancelled share at 13.5%.

A weekend timetable, so the 17,534 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

Buses on this date: 95,548 journeys followed to their destination, 64.8% on time.

The day in numbers

Passenger trains recorded17,534
Cancelled3021.7%
Arrival time recorded12,60073.1% of those that ran
…arrived within 5 minutes10,76685.4%
…arrived 5 to 30 minutes late1,72213.7%
…arrived more than 30 minutes late1120.9%
Average delay at destination2 min

Every percentage among the bands is of the 12,600 trains whose arrival reached the archive — not of all 17,534, and the bands are exclusive. 4,632 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 1,689 runs down to LS on 2. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR1,6891%1,090 89% 87% 1.7 min
South Western Railway SW1,4920%734 87% 86% 2 min
Northern NT1,4341%1,191 81% 80% 2.5 min
Southern SN1,3773%929 82% 79% 2.5 min
Great Western Railway GW1,2382%906 82% 80% 2.4 min
London Overground LO1,1663%1,075 93% 90% 0.4 min
Southeastern SE1,1280%927 80% 80% 2.7 min
Greater Anglia LE1,0860%817 95% 95% 0 min
Transport for Wales AW9151%689 89% 88% 0.9 min
Thameslink TL7247%337 79% 69% 3.3 min
London Underground LT6550%286 89% 89% 2.4 min
West Midlands Railway LM6461%625 81% 80% 2.7 min
Elizabeth line XR5204%493 98% 94% -0.8 min
TransPennine Express TP4891%290 88% 86% 0.2 min
East Midlands Railway EM4362%309 80% 78% 2.5 min
Merseyrail ME3872%311 98% 95% 0.4 min
Great Northern GN3060%244 93% 93% 0.6 min
Avanti West Coast VT2911%218 32% 31% 13.4 min
CrossCountry XC22914%130 68% 55% 5.8 min
London North Eastern Railway GR2213%160 69% 67% 7.7 min
c2c CC2110%145 97% 97% 0.9 min
Chiltern Railways CH1933%188 95% 93% 0.4 min
Heathrow Express HX1510%151 95% 95% 0.1 min
Island Line IL1350%0 — — —
Tyne and Wear Metro TW1280%126 87% 87% 2.1 min
Gatwick Express GX720%72 89% 89% 1.2 min
Eurostar ES530%53 70% 70% 8.1 min
Sheffield Supertram SJ510%51 98% 98% 0 min
Charter/Other ZZ320%0 — — —
Grand Central GC2110%16 38% 33% 28.2 min
West Coast Railway Co WR120%2 100% 100% -51.5 min
Hull Trains HT120%12 75% 75% 2.3 min
Lumo LD119%8 63% 56% 1.4 min
Lumo Stirling LF80%8 13% 13% 31 min
Caledonian Sleeper CS70%6 67% 67% 1.3 min
TY TY60%0 — — —
LS LS20%1 0% 0% 77 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 83% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

380 services

This service has been delayed by congestion

341 services

This service has been delayed by a tunnel being closed for safety reasons

160 services

This service has been delayed by a speed restriction over defective track

149 services

This service has been delayed by a fault with the signalling system

132 services

This service has been delayed by a speed restriction

128 services

This service has been delayed by a points failure

82 services

This service has been delayed by slippery rails

79 services

Why trains were cancelled

A reason reached the archive for 181 of the 302 cancellations (59.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a tunnel being closed for safety reasons

69 services

This service has been cancelled because of a shortage of train drivers

30 services

This service has been cancelled because of engineering works not being finished on time

17 services

This service has been cancelled because of a fault with the signalling system

16 services

This service has been cancelled because of urgent repairs to the track

13 services

This service has been cancelled because of damage to the overhead electric wires

13 services

This service has been cancelled because of a points failure

12 services

This service has been cancelled because of a late running train being in front of this one

11 services

The longest delays

The worst of them arrived 4h 03m behind schedule — London Kings Cross to Sunderland, booked away at 10:00, run by Grand Central. The ten longest range from 4h 03m down to 1h 20m, and they belong to 6 operators, London North Eastern Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
10:00London Kings Cross to Sunderland 1N90 · GC4h 03m
18:00Edinburgh to London Kings Cross 1E26 · GR2h 33m
11:03London Kings Cross to Edinburgh 1S13 · GR2h 09m
10:03Birmingham New Street to Edinburgh 1S39 · XC1h 56m
18:03London Kings Cross to Edinburgh 1S27 · GR1h 56m
12:30Sunderland to London Kings Cross 1A65 · GC1h 41m
07:49Exeter St Davids to Basingstoke 1L32 · SW1h 34m
16:38Glasgow Central to London Euston 1M17 · VT1h 31m
11:31Bristol Temple Meads to Aberdeen 1S45 · XC1h 21m
12:40Amsterdam CS to London St Pancras (Intl) 9I43 · ES1h 20m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 05:00, when 34% of 101 arrived within five minutes.

00 145
01 44
02 25
03 23
04 50
05 101
06 254
07 544
08 887
09 1,121
10 1,131
11 1,115
12 1,138
13 1,148
14 1,136
15 1,152
16 1,154
17 1,130
18 1,115
19 1,032
20 976
21 877
22 765
23 471

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 23.

What ran

Formations were recorded for 14,864 trains on this date, made up of 2,208 individual units and 9,859 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,637 of the day's recorded trains from a pool of 146 units.

The average train was 5.8 vehicles long. The longest formation recorded was 24 vehicles.

ClassTrainsUnits used
Class 3771,637146
Class 34590458
Class 72089387
Class 158871115
Class 38785473
Class 70071284
Class 15068965
Class 16560352
Class 45057281
Class 38556857
Class 37556567
Class 17055586

Of 17,534 runs, 14,864 had a formation published (85%) — these are allocations rather than observations.

Buses

11,239 buses from 119 operators were seen on this date, across 1,964,651 position reports.

95,548 bus journeys were followed to their destination on this date. 61,942 arrived on time, 6,786 late, and 26,820 — 28% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination95,548
On time61,94264.8%
Early26,82028.1%
Late6,7867.1%
…more than 15 minutes late5900.6%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO76,94465%29%
Nottingham City Transport NCTR1,74779%17%
Go North East GNEL1,24071%9%
First Leeds FLDS1,23260%26%
First Bristol, Bath & the West FBRI1,21964%22%
First South Yorkshire FSYO1,17060%24%
National Express NATX90531%39%
Bee Network BNML56974%17%
Bee Network BNSM55978%17%
Arriva Yorkshire WRAY43363%29%
Brighton & Hove Bus and Coach Company BHBC35776%16%
Preston Bus PBLT34771%22%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (31%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 15 Nov 2026 itself. How these figures are measured · Sources and licences