TransitRadar

Friday, 27 November 2026

The railway ran close to plan on Friday, 27 November 2026: 85% of the 22,215 passenger trains whose arrival was recorded were within five minutes, and only 366 of 26,183 were cancelled.

18,780 of the 22,215 trains whose arrival was recorded were within five minutes, and the average delay was 2.2 minutes. Days like this rarely make the news, which is part of why they are worth recording.

Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.

Even so, 186 trains were more than half an hour late. The worst was the 16:30 Edinburgh to London Kings Cross, which arrived 2h 36m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (775 services).

Buses on this date: 140,738 journeys followed to their destination, 65.3% on time.

The day in numbers

Passenger trains recorded26,183
Cancelled3661.4%
Arrival time recorded22,21586.0% of those that ran
…arrived within 5 minutes18,78084.5%
…arrived 5 to 30 minutes late3,24914.6%
…arrived more than 30 minutes late1860.8%
Average delay at destination2.2 min

Every percentage among the bands is of the 22,215 trains whose arrival reached the archive — not of all 26,183, and the bands are exclusive. 3,602 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,059 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0591%2,221 86% 85% 2.3 min
Northern NT2,8442%2,652 80% 78% 2.7 min
Great Western Railway GW2,1891%1,698 79% 78% 3.1 min
Southeastern SE1,8151%1,788 87% 87% 1.9 min
South Western Railway SW1,7863%1,539 73% 71% 3.8 min
Southern SN1,7191%1,666 89% 88% 1.4 min
London Overground LO1,6152%1,574 96% 94% 0.1 min
West Midlands Railway LM1,3342%1,276 81% 80% 2.6 min
Greater Anglia LE1,3110%1,306 95% 95% -0.1 min
Transport for Wales AW1,2482%1,032 89% 87% 0.6 min
Thameslink TL9921%634 91% 89% 0.9 min
London Underground LT7830%223 87% 86% 3.1 min
East Midlands Railway EM7051%502 76% 76% 3.2 min
Elizabeth line XR6960%695 99% 99% -1.3 min
Merseyrail ME6221%606 98% 97% -0.3 min
Great Northern GN4322%391 91% 89% 1.3 min
c2c CC4215%348 93% 88% 1.6 min
Avanti West Coast VT4201%312 36% 35% 11.2 min
CrossCountry XC3484%263 44% 42% 11 min
Chiltern Railways CH3396%316 93% 87% 0.9 min
TransPennine Express TP3320%317 69% 69% 4.2 min
London North Eastern Railway GR3191%192 53% 52% 12.7 min
Tyne and Wear Metro TW1740%172 96% 96% 1.1 min
Heathrow Express HX1520%152 95% 95% 0.5 min
Island Line IL1350%62 90% 90% 5 min
Sheffield Supertram SJ980%64 98% 98% 1.2 min
Gatwick Express GX720%72 81% 81% 2.7 min
Charter/Other ZZ710%10 70% 70% 3.3 min
Eurostar ES590%57 63% 63% 10.9 min
Grand Central GC210%21 52% 52% 11.4 min
Hull Trains HT140%14 29% 29% 20.4 min
Lumo LD120%12 42% 42% 16.7 min
West Coast Railway Co WR100%6 67% 67% 4.3 min
LS LS100%0 — — —
Lumo Stirling LF100%10 70% 70% 3.8 min
SO SO60%6 67% 67% 2.8 min
Caledonian Sleeper CS60%6 83% 83% -2.3 min
TY TY40%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 83% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

775 services

This service has been delayed by a speed restriction

747 services

This service has been delayed by a speed restriction over defective track

413 services

This service has been delayed by congestion

366 services

This service has been delayed by a fault with the signalling system

352 services

This service has been delayed by a problem currently under investigation

231 services

This service has been delayed by a fault with the signalling system earlier today

140 services

This service has been delayed by a fault on a train earlier

135 services

Why trains were cancelled

A reason reached the archive for 190 of the 366 cancellations (51.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

58 services

This service has been cancelled because of a late running train being in front of this one

37 services

This service has been cancelled because of congestion

21 services

This service has been cancelled because of a fault on this train

17 services

This service has been cancelled because of a speed restriction

16 services

This service has been cancelled because of a fault on a train

15 services

This service has been cancelled because of train crew being delayed

13 services

This service has been cancelled because of a shortage of train crew

13 services

The longest delays

The worst of them arrived 2h 36m behind schedule — Edinburgh to London Kings Cross, booked away at 16:30, run by London North Eastern Railway. The ten longest range from 2h 36m down to 1h 27m, and they belong to 5 operators, London North Eastern Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
16:30Edinburgh to London Kings Cross 1E23 · GR2h 36m
17:33London Kings Cross to Newcastle 1N12 · GR2h 35m
15:43Dundee to Edinburgh 1L22 · SR2h 23m
17:42Oxenholme Lake District to Windermere 2C16 · NT2h 21m
11:59Elephant & Castle Underground to Stonebridge Park 2I23 · LT2h 07m
16:32Elephant & Castle Underground to Stonebridge Park 2I10 · LT1h 57m
18:55Windermere to Manchester Airport 1Y83 · NT1h 36m
10:03London Kings Cross to Aberdeen 1S11 · GR1h 34m
15:51Liverpool Lime Street to Norwich 1L15 · EM1h 29m
17:29Manchester Airport to Windermere 1C73 · NT1h 27m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 55% of 157 arrived within five minutes.

00 157
01 45
02 19
03 27
04 158
05 932
06 1,616
07 1,662
08 1,541
09 1,439
10 1,416
11 1,400
12 1,397
13 1,405
14 1,410
15 1,454
16 1,557
17 1,617
18 1,521
19 1,355
20 1,220
21 1,128
22 1,001
23 706

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 19.

What ran

Formations were recorded for 27,138 trains on this date, made up of 2,897 individual units and 12,737 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,260 of the day's recorded trains from a pool of 217 units.

The average train was 5.6 vehicles long. The longest formation recorded was 19 vehicles.

ClassTrainsUnits used
Class 3773,260217
Class 4651,59399
Class 4501,495116
Class 7201,432123
Class 1581,420134
Class 3871,35293
Class 3451,25571
Class 1501,25494
Class 1651,15763
Class 1561,11390
Class 3851,02267
Class 7001,020106

Of 26,183 runs, 27,138 had a formation published (104%) — these are allocations rather than observations.

Buses

17,551 buses from 189 operators were seen on this date, across 3,238,530 position reports.

140,738 bus journeys were followed to their destination on this date. 91,910 arrived on time, 13,458 late, and 35,370 — 25% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination140,738
On time91,91065.3%
Early35,37025.1%
Late13,4589.6%
…more than 15 minutes late1,8621.3%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO109,29868%25%
Nottingham City Transport NCTR2,60172%18%
Go North East GNEL1,93064%14%
First Leeds FLDS1,62649%31%
Bee Network BNSM90270%23%
National Express NATX85428%36%
Arriva Yorkshire WRAY84649%31%
Bee Network BNML80963%24%
First Potteries FPOT78350%31%
First Bristol, Bath & the West FBRI72056%26%
First Leicester FLEI70056%36%
Preston Bus PBLT70061%30%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (81%), and National Express furthest from it (28%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 27 Nov 2026 itself. How these figures are measured · Sources and licences